{"id":"court_ctb_728_7","court":"CTB","case_no":"22-50073","doc_number":728,"sub_number":7,"doc_type":"EXHIBIT","filed_date":null,"title":"EXHIBIT G ![](_page_1_Picture_1.jpeg)","summary_zh":null,"summary_en":null,"body_en":"## **EXHIBIT G**\n\n![](_page_1_Picture_1.jpeg)\n\nJUST OUTSIDE SAVANNAH ON THE INTRACOASTAL WATERWAY SINCE 1965 P.O. Box 5628 Savannah Georgia 31414\n\nDate: 28 July 2022 Customer: M/Y Lady May (152f) (46.2m) 2014 Feadship Contact Name: Capt. Lloyd Bernard Phone: +1 305 799 4799 Email: captain@yachtladymay.com Billing Address:\n\nTMI Budget Proposal Revised\n\n| Task No. | Billing<br>Type | Task Description                                                                    | Labor   | Material | Misc.   | Total              |\n|----------|-----------------|-------------------------------------------------------------------------------------|---------|----------|---------|--------------------|\n|          |                 | HAULOUT & GENERAL SERVICES                                                          |         |          |         |                    |\n| 1.05     | A               | Haulout Plan                                                                        | \\$1,250 |          |         | \\$1,250            |\n|          |                 | Develop TMI Syncrolift Docking Plans From Vessel Supplied Drawings                  |         |          |         |                    |\n| 1.00     | Q               | Haul & Float With Syncrolift                                                        |         |          | \\$6,080 | \\$6,080            |\n| 1.10     | A               | Blocking for Haulout                                                                | \\$2,250 | \\$525    |         | \\$2,775            |\n|          |                 | Pending review of docking plan or vessel request for special requirements.          |         |          |         |                    |\n|          |                 | Includes one setup. Additional blocking required for specific tasks will be quoted  |         |          |         |                    |\n|          |                 | seperately. Bottom areas under bilge blocks to be treated through alternate         |         |          |         |                    |\n|          |                 | blocking in a subsequent haulout.                                                   |         |          |         |                    |\n| 1.11     | A               | Rail car weekly rate \\$240                                                          |         |          |         | weekly             |\n| 1.15     | Q               | Diver Services for Haulout                                                          |         |          | \\$1,600 | \\$1,600<br>\\$1,824 |\n| 1.20     | Q               | Pressure Wash Bottom at Haulout                                                     |         |          | \\$1,824 |                    |\n|          |                 | Note: Standard rate sheet price for machine pressure washing. Scraping and          |         |          |         |                    |\n|          |                 | sanding to remove excess marine growth will be priced upon inspection if            |         |          |         |                    |\n| 1.08     | A               | required.<br>Anchors & Chain if required                                            |         |          |         | T&M                |\n|          |                 | Remove Anchor and Chains from Vessel Prior to Haulout and Refit After Launch.       |         |          |         |                    |\n|          |                 | Note: Includes labor, floats, tug and crane.                                        |         |          |         |                    |\n| 1.30     | A               | Yard Services Fee Daily Rate                                                        |         |          |         | daily rate         |\n|          |                 | OFF PEAK (JAN-AUG) \\$228 in water / \\$304 on hard / \\$532 in bldg                   |         |          |         |                    |\n|          |                 | PEAK (SEP-DEC) \\$532 in water / \\$608 on hard / \\$836 in bldg                       |         |          |         |                    |\n|          |                 | Includes water, project management, administrative services, yard security, non     |         |          |         |                    |\n|          |                 | regulated refuse collection, one stair tower. Additional ISPS/MTSA security         |         |          |         |                    |\n|          |                 | services can be arranged at additional cost. Additional stair towers \\$1200         |         |          |         |                    |\n|          |                 |                                                                                     |         |          |         |                    |\n| 1.31     | A               | Live aboard Fee                                                                     |         |          |         | T&M                |\n|          |                 | \\$1/ft/day live aboard fee may apply on the hard and in building.                   |         |          |         |                    |\n|          |                 | Liveaboard is not recommended during paint work and is not allowed in the spray     |         |          |         |                    |\n|          |                 | booth.                                                                              |         |          |         |                    |\n| 1.35     | Q               | Shorepower Hookup & Disconnect                                                      |         |          | \\$175   | \\$175              |\n|          |                 | One time fee for labor, standard hookup to shore connection. Any modifications,     |         |          |         |                    |\n|          |                 | materials or equipment required will be priced additionally. \\$1000 deposit for use |         |          |         |                    |\n|          |                 | of TMI shorepower plug.                                                             |         |          |         |                    |\n| 1.36     | Q               | Cooling Tower Hookup & Disconnect                                                   |         |          | \\$250   | \\$250              |\n|          |                 | One time fee for labor, standard hookup to shore connection. Any modifications,     |         |          |         |                    |\n|          |                 | materials or equipment required will be priced additionally.                        |         |          |         |                    |\n| 1.37     | Q               | Black & Grey Water Hookup & Disconnect                                              |         |          | \\$300   | \\$300              |\n|          |                 | One time fee for labor, standard hookup to shore connection. Any modifications,     |         |          |         |                    |\n|          |                 | materials or equipment required will be priced additionally. Disposal charged       |         |          |         |                    |\n|          |                 | additionally per rate sheet                                                         |         |          |         |                    |\n| 1.38     | Q               | Dedicated Internet Connection                                                       |         |          |         | monthly            |\n|          |                 | Hardwire or Nanobeam as available \\$150 Monthly                                     |         |          |         |                    |\n| 1.39     | A               | Sewage Connection in Service Bldg.                                                  |         |          |         | daily rate         |\n| 1.40     | A               | \\$10 Daily as applicable.<br>Shorepower                                             |         |          |         | daily rate         |\n|          |                 | Daily Rate per cord based on vessel's requirements. See Rate Sheet.                 |         |          |         |                    |\n| 1.50     | A               | Air Conditioning Condenser Cooling Tower                                            |         |          |         | daily rate         |\n|          |                 | \\$50 Daily Rate                                                                     |         |          |         |                    |\n| 1.60     | A               | Yard Equipment With Operator                                                        |         |          |         | T&M                |\n|          |                 | Hourly per rate sheet. Mandatory assist invoiced additionally at \\$75/hr.           |         |          |         |                    |\n| 1.70     | A               | Storage                                                                             |         |          |         | T&M                |\n|          |                 | Storage locker or 20 ft. shipping container rental for storage of vessel equipment. |         |          |         |                    |\n|          |                 | \\$300 Monthly Rate Per Unit / \\$400 per work space                                  |         |          |         |                    |\n| 1.80     | A               | Tenders UP TO 32 FT AND 10,000 LBS                                                  |         |          |         | T&M                |\n|          |                 | Haul & launch tenders by yard crane \\$300 per Tender or two jet skis.               |         |          |         |                    |\n|          |                 | Storage \\$150 /month/tender \\$75 /month/jet ski.                                    |         |          |         |                    |\n|          |                 | Request for special blocking - T&M                                                  |         |          |         |                    |\n| 1.90     | A               | Hazardous Liquids Disposal                                                          |         |          |         | T&M                |\n|          |                 | Disposal of Used Oil, Oily Water, Black & Gray Water, Coolant etc. billed per       |         |          |         |                    |\n|          |                 | gallon, see Rate Sheet. Note: Handling & Equipment Fees charged additionally.       |         |          |         |                    |\n|          |                 |                                                                                     |         |          |         |                    |\n\n## Date: 28 July 2022 Customer: M/Y Lady May (152f) (46.2m) 2014 Feadship Contact Name: Capt. Lloyd Bernard Phone: +1 305 799 4799 Email: captain@yachtladymay.com Billing Address:\n\nTMI Budget Proposal Revised\n\n| Task No. | Billing<br>Type | Task Description                                                                                                                                                                                                                                                                             | Labor    | Material | Misc. | Total              |\n|----------|-----------------|----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|----------|----------|-------|--------------------|\n| 1.95     | A               | Foreign Waste Collection & Disposal - As Required                                                                                                                                                                                                                                            |          |          |       | T&M                |\n|          |                 | Contract IWC on behalf of vessel for collection and disposal of foreign waste/                                                                                                                                                                                                               |          |          |       |                    |\n|          |                 | regulated garbage. Vessel must provide a copy of CBP Form AI-288                                                                                                                                                                                                                             |          |          |       |                    |\n|          |                 | certifying coastwise status as required by government regulations. Without                                                                                                                                                                                                                   |          |          |       |                    |\n|          |                 | this form all of the vessel's garbage will be considered Regulated Garbage. See                                                                                                                                                                                                              |          |          |       |                    |\n|          |                 | arrival package document T-Dept. of Homeland Security U.S. CBP Maritime<br>Regulated Garbage Disposal Guidelines                                                                                                                                                                             |          |          |       |                    |\n|          |                 |                                                                                                                                                                                                                                                                                              |          |          |       |                    |\n| 1.99     | A               | Outside Contractor Facility / Utility Use Fee                                                                                                                                                                                                                                                |          |          |       | T&M                |\n|          |                 | 15% Outside Contractor Facility / Utility Use Fee<br>5% for main engine and generator service contracted directly with vessel.                                                                                                                                                               |          |          |       |                    |\n|          |                 | Vessel to present contractor's worklist and schedule prior to access for work                                                                                                                                                                                                                |          |          |       |                    |\n|          |                 | being granted. Contractors must submit proof of insurance and have signed                                                                                                                                                                                                                    |          |          |       |                    |\n|          |                 | agreement on file with TMI. Applies to all outside contractors working directly for                                                                                                                                                                                                          |          |          |       |                    |\n|          |                 | vessel in TMI facility. Vendor Warranty Applies.                                                                                                                                                                                                                                             |          |          |       |                    |\n| .90      | A               | Crew Purchases                                                                                                                                                                                                                                                                               |          |          |       | T&M                |\n|          |                 | Note: Dedicated Driver Runs and Materials Research will be billed in addition to                                                                                                                                                                                                             |          |          |       |                    |\n|          |                 | materials charge if requested.                                                                                                                                                                                                                                                               |          |          |       |                    |\n| .75      | A               | Shipping & Receiving<br>Note: Custom Crating & Packaging will be Quoted in addition to Shipping                                                                                                                                                                                              |          |          |       | T&M                |\n|          |                 | Charges if required.                                                                                                                                                                                                                                                                         |          |          |       |                    |\n| .25      | A               | General Cover & Protect                                                                                                                                                                                                                                                                      |          |          |       | T&M                |\n|          |                 | For areas not addressed by specific work order. Extent of cover and protect for                                                                                                                                                                                                              |          |          |       |                    |\n|          |                 | duration of project will be determined by vessel's representative and priced                                                                                                                                                                                                                 |          |          |       |                    |\n|          |                 | accordingly.                                                                                                                                                                                                                                                                                 |          |          |       |                    |\n| .10      | A               | Technical Services and Drawings                                                                                                                                                                                                                                                              |          |          |       | T&M                |\n|          |                 | \\$125 Hourly per Rate Sheet                                                                                                                                                                                                                                                                  |          |          |       |                    |\n|          |                 | SUBTOTAL GENERAL SERVICES<br>EXCLUDING VARIABLES & UNKNOWNS                                                                                                                                                                                                                                  |          |          |       | \\$14,254           |\n|          |                 |                                                                                                                                                                                                                                                                                              |          |          |       |                    |\n|          | A               | R&R 26 Valves for Inspection                                                                                                                                                                                                                                                                 | \\$20,800 | \\$1,092  |       | \\$21,892           |\n|          |                 | Remove through hull valves/check valves as directed by class surveyor/vessel                                                                                                                                                                                                                 |          |          |       |                    |\n|          |                 | rep for class Inspection. Clean, check & pressure test valves as directed by                                                                                                                                                                                                                 |          |          |       |                    |\n|          |                 | Surveyor. Convey valves to shop, wash out & clean valves as necessary for                                                                                                                                                                                                                    |          |          |       |                    |\n|          |                 | pressure testing. Hydrostatically test valves & furnish Test / Condition Found                                                                                                                                                                                                               |          |          |       |                    |\n|          |                 | Report for Vessel & Surveyor. Reinstall valves when directed using new gaskets.                                                                                                                                                                                                              |          |          |       |                    |\n|          |                 | Note; Any further service, repairs or replacement parts, or new valves will be<br>quoted from condition found report & addressed with a change order. Allowance                                                                                                                              |          |          |       |                    |\n|          |                 | of 10 Hours Labor & Misc. Materials per Valve for Twenty Six (26) valves per                                                                                                                                                                                                                 |          |          |       |                    |\n|          |                 | vessel's request. Removal & replacement of any pipework or Interferences to                                                                                                                                                                                                                  |          |          |       |                    |\n|          |                 | gain access to valves will be quoted as emergent work upon inspection of vessel.                                                                                                                                                                                                             |          |          |       |                    |\n|          |                 | Assumes all parts are in good working order and does not include work on                                                                                                                                                                                                                     |          |          |       |                    |\n|          |                 | damaged or worn parts or threads.                                                                                                                                                                                                                                                            |          |          |       |                    |\n|          |                 |                                                                                                                                                                                                                                                                                              |          |          |       |                    |\n|          |                 |                                                                                                                                                                                                                                                                                              |          |          |       |                    |\n|          |                 | SUBTOTAL R&R VALVES<br>EXCLUDING VARIABLES & UNKNOWNS                                                                                                                                                                                                                                        |          |          |       | \\$21,892           |\n|          |                 | ALL OTHER SERVICES WILL BE ADDRESSED ON SEPARATE WORK PROPOSALS                                                                                                                                                                                                                              |          |          |       |                    |\n|          |                 | 7% Georgia Sales Tax                                                                                                                                                                                                                                                                         |          |          |       | as applicable      |\n|          |                 | 1.5% Ship Repairer's Liability                                                                                                                                                                                                                                                               |          |          |       | as applicable      |\n|          |                 | 1% Environmental Surcharge                                                                                                                                                                                                                                                                   |          |          |       | as applicable      |\n|          |                 |                                                                                                                                                                                                                                                                                              |          |          |       |                    |\n|          |                 | Freight charges will be added as applicable                                                                                                                                                                                                                                                  |          |          |       |                    |\n|          |                 | This proposal is subject to inspection at time of service. Inspection findings may impact costs and schedule. This proposal is inclusive only                                                                                                                                                |          |          |       |                    |\n|          |                 | of work as described. Additions and/or changes will be documented for approval including proposal for pricing and effect on                                                                                                                                                                  |          |          |       | vessel's schedule. |\n|          |                 | Bi-weekly invoices will be presented during the project. If requested at time of signature for tasks listed for T&M billing, time sheets will be                                                                                                                                             |          |          |       |                    |\n|          |                 | presented daily for review by the vessel's appointed representative. A deposit is required to secure space. This proposal is valid for 30 days.<br>TMI proposals are not valid until signed by a TMI representative after mutual agreement of terms and yard dates, due to the potential for |          |          |       |                    |\n|          |                 | competing projects with similar timeframes requiring the same resources. Invoices must be paid in irrevocable funds and payment received                                                                                                                                                     |          |          |       |                    |\n|          |                 | prior to vessel's launch and departure.                                                                                                                                                                                                                                                      |          |          |       |                    |\n|          |                 |                                                                                                                                                                                                                                                                                              |          |          |       |                    |\n|          |                 | THUNDERBOLT MARINE, INC. WORK AUTHORIZATION TERMS AND CONDITIONS, WHETHER PRINTED ON THE REVERSE OF THIS ORIGINAL<br>SIGNATURE PAGE OR SENT AS A SEPARATE PAGE, ARE STIPULATED TO BE PART OF THE AGREEMENT.                                                                                  |          |          |       |                    |\n\nTHUNDERBOLT MARINE, INC. WORK AUTHORIZATION TERMS AND CONDITIONS, WHETHER PRINTED ON THE REVERSE OF THIS ORIGINAL SIGNATURE PAGE OR SENT AS A SEPARATE PAGE, ARE STIPULATED TO BE PART OF THE AGREEMENT.\n\n| Signed: |                                                                                           | Date: |  |\n|---------|-------------------------------------------------------------------------------------------|-------|--|\n|         | Owner or Authorized Representative                                                        |       |  |\n|         |                                                                                           |       |  |\n| Signed: |                                                                                           | Date: |  |\n|         | For Thunderbolt Marine Inc. Any amount over \\$25,000 must be signed by a company Officer. |       |  |","body_zh":"证据G\n\n自1965年以来，位于萨凡纳附近的内陆沿岸水道　P.O. Box 5628 Savannah Georgia 31414\n\n日期：28 July 2022　客户：M/Y Lady May（Lady May号）（152f）（46.2m）2014 Feadship（Feadship）　联系人姓名：Capt. Lloyd Bernard（Lloyd Bernard船长）　电话：+1 305 799 4799　电子邮件：captain@yachtladymay.com　账单地址：\n\nTMI修订预算报价书\n\n任务编号　计费\n类型　任务说明　人工　材料　杂项　合计\n\n上坞及一般服务\n1.05　A　上坞计划　$1,250　$1,250\n根据船舶提供的图纸制定TMI Syncrolift上坞计划。\n1.00　Q　使用Syncrolift上坞及下水　$6,080　$6,080\n1.10　A　上坞垫墩　$2,250　$525　$2,775\n待审核上坞计划，或待船舶提出特殊要求。\n包括一次设置。特定任务所需的额外垫墩将另行报价。\n舱底墩下方的船底区域将在后续一次上坞中通过替代性\n垫墩方式处理。\n1.11　A　轨道车周费率　$240　每周\n1.15　Q　上坞潜水员服务　$1,600　$1,600\n$1,824\n1.20　Q　上坞时高压清洗船底　$1,824\n注：机器高压清洗按标准费率表价格计费。如需刮除和\n打磨以清除过多的海洋附着物，将在检查后另行定价，如\n1.08　A　有需要。\n如有需要，锚及锚链　工时及材料（T&M）\n在上坞前从船舶拆除锚及锚链，并在下水后重新安装。\n注：包括人工、浮具、拖船及起重机。\n1.30　A　船厂服务费日费率　日费率\n淡季（JAN-AUG）水中$228／陆地$304／建筑物内$532\n旺季（SEP-DEC）水中$532／陆地$608／建筑物内$836\n包括用水、项目管理、行政服务、船厂安保、非\n管制废弃物收集及一座楼梯塔。可另行付费安排额外的ISPS/MTSA安保\n服务。额外楼梯塔$1200\n\n1.31　A　船上居住费　T&M\n在陆地及建筑物内可能适用$1/ft/day的船上居住费。\n油漆作业期间不建议在船上居住，且喷漆\n间内不允许居住。\n1.35　Q　岸电连接及断开　$175　$175\n一次性人工费用，按标准方式连接至岸上设施。所需的任何改装、\n材料或设备将另行定价。使用TMI岸电插头需缴纳$1000押金。\n1.36　Q　冷却塔连接及断开　$250　$250\n一次性人工费用，按标准方式连接至岸上设施。所需的任何改装、\n材料或设备将另行定价。\n1.37　Q　黑水及灰水连接及断开　$300　$300\n一次性人工费用，按标准方式连接至岸上设施。所需的任何改装、\n材料或设备将另行定价。处置费用\n将按照费率表另行计收。\n1.38　Q　专用互联网连接　每月\n视可用情况采用硬接线或Nanobeam，每月$150。\n1.39　A　服务建筑物内的污水连接　日费率\n1.40　A　酌情每日$10。\n岸电　日费率\n根据船舶需求按每根电缆收取日费率。见费率表。\n1.50　A　空调冷凝器冷却塔　日费率\n日费率$50。\n1.60　A　配备操作员的船厂设备　T&M\n按费率表按小时计费。强制协助将按$75/hr另行开票。\n1.70　A　存储　T&M\n用于存放船舶设备的储物柜或20 ft.集装箱租赁。\n每单元每月费率$300／每个工作空间$400。\n1.80　A　不超过32 FT及10,000 LBS的附属艇　T&M\n由船厂起重机上坞及下水附属艇，每艘附属艇或两辆水上摩托车$300。\n存储费：附属艇$150/月，水上摩托车$75/月。\n特殊垫墩请求－T&M\n1.90　A　危险液体处置　T&M\n废油、含油水、黑水及灰水、冷却液等的处置按\n加仑计费，见费率表。注：搬运及设备费用另行收取。\n\n日期：28 July 2022　客户：M/Y Lady May（Lady May号）（152f）（46.2m）2014 Feadship（Feadship）　联系人姓名：Capt. Lloyd Bernard（Lloyd Bernard船长）　电话：+1 305 799 4799　电子邮件：captain@yachtladymay.com　账单地址：\n\nTMI修订预算报价书\n\n任务编号　计费\n类型　任务说明　人工　材料　杂项　合计\n\n1.95　A　外国废弃物收集及处置－按需　T&M\n代表船舶与IWC签约，收集及处置外国废弃物／\n受管制垃圾。船舶必须提供CBP Form AI-288副本，\n以证明政府法规要求的沿岸运输状态。没有\n该表格，船舶的所有垃圾均将被视为受管制垃圾。见\n到港资料包文件T-Dept. of Homeland Security U.S. CBP Maritime\nRegulated Garbage Disposal Guidelines\n\n1.99　A　外部承包商设施／公用设施使用费　T&M\n15%外部承包商设施／公用设施使用费\n直接与船舶签约的主机及发电机服务收取5%。\n船舶须在获准进入作业前提交承包商的工作清单及进度表。\n承包商必须提交保险证明，并与TMI签署协议存档。适用于\n在TMI设施内直接为船舶作业的所有外部承包商。适用供应商保修。\n.90　A　船员采购　T&M\n注：如有要求，专用司机出行及材料调研将除\n材料费用外另行计费。\n.75　A　收发货\n注：如有需要，定制装箱及包装将除运输费用外另行报价　T&M\n费用。\n.25　A　一般覆盖及保护　T&M\n适用于未由具体工作订单处理的区域。项目期间覆盖及保护的\n范围将由船舶代表确定，并据此定价。\n.10　A　技术服务及图纸　T&M\n按费率表每小时$125。\n一般服务小计\n不包括变量及未知事项　$14,254\n\nA　拆卸及重新安装26个阀门以供检查　$20,800　$1,092　$21,892\n按船级社验船师／船舶代表的指示，拆除船体通海阀／止回阀，\n以进行船级检查。按验船师指示清洁、检查及对阀门进行压力测试。\n将阀门运送至车间，按压力测试需要冲洗及清洁阀门。\n对阀门进行静水压测试，并为船舶及验船师提供测试／发现状况\n报告。按指示使用新垫片重新安装阀门。\n注：任何进一步服务、维修或更换零件，或新阀门，将根据\n发现状况报告报价，并通过变更订单处理。根据船舶要求，\n二十六（26）个阀门中每个阀门预留10小时人工及杂项材料。\n为取得阀门通道而拆除及更换任何管路或干涉物，将在检查船舶后\n作为紧急工程另行报价。假设所有零件均处于良好工作状态，且不包括对\n损坏或磨损的零件或螺纹的作业。\n\n阀门拆卸及重新安装小计\n不包括变量及未知事项　$21,892\n所有其他服务将另以单独工作报价书处理\n7% Georgia Sales Tax　如适用\n1.5%船舶修理商责任险　如适用\n1%环境附加费　如适用\n\n如适用，将加收运费。\n本报价须在提供服务时接受检查。检查结果可能影响费用及进度。本报价仅包括\n所述工作。增项及／或变更将形成文件以供批准，包括定价报价书及对船舶进度的影响。\n项目期间将每两周提交一次发票。如在签署时提出要求，对于列明按T&M计费的任务，工时表将\n每日提交供船舶指定代表审查。为确保场地，须支付押金。本报价有效期为30日。\n由于可能存在时间范围相近且需要相同资源的竞争项目，TMI报价书在经双方就条款及船厂日期达成一致后，\n由TMI代表签署前无效。发票必须以不可撤销资金支付，并且必须在\n船舶下水及离港前收到付款。\n\nTHUNDERBOLT MARINE, INC.（Thunderbolt Marine, Inc.）工作授权条款和条件，无论印在本原始\n签署页背面还是作为单独页面发送，均规定为协议的一部分。\n\nTHUNDERBOLT MARINE, INC.工作授权条款和条件，无论印在本原始签署页背面还是作为单独页面发送，均规定为协议的一部分。\n\n签署：　日期：\n\n船东或授权代表\n\n签署：　日期：\n代表Thunderbolt Marine Inc.　任何超过$25,000的金额必须由公司高级管理人员签署。","key_entities":["Je"],"ecf_references":[],"word_count":2221,"status":"published","published_at":null,"created_at":null,"updated_at":"2026-08-23 18:46:44"}