{"id":"court_ctb_889_7","court":"CTB","case_no":"22-50073","doc_number":889,"sub_number":7,"doc_type":"UNKNOWN","filed_date":null,"title":"HK-7 ![](_page_1_Picture_1.jpeg)","summary_zh":null,"summary_en":null,"body_en":"## **HK-7**\n\n![](_page_1_Picture_1.jpeg)\n\nJUST OUTSIDE SAVANNAH ON THE INTRACOASTAL WATERWAY SINCE 1965 P.O. Box 5628 Savannah Georgia 31414\n\nDate: 28 July 2022 Customer: M/Y Lady May (152f) (46.2m) 2014 Feadship Contact Name: Capt. Lloyd Bernard Phone: +1 305 799 4799 Email: captain@yachtladymay.com Billing Address:\n\nTMI Budget Proposal Revised\n\n| Task No. | Billing<br>Type | Task Description                                                                                              | Labor   | Material | Misc.   | Total              |\n|----------|-----------------|---------------------------------------------------------------------------------------------------------------|---------|----------|---------|--------------------|\n|          |                 | HAULOUT & GENERAL SERVICES                                                                                    |         |          |         |                    |\n| 1.05     | A               | Haulout Plan                                                                                                  | \\$1,250 |          |         | \\$1,250            |\n|          |                 | Develop TMI Syncrolift Docking Plans From Vessel Supplied Drawings                                            |         |          |         |                    |\n| 1.00     | Q               | Haul & Float With Syncrolift                                                                                  |         |          | \\$6,080 | \\$6,080            |\n| 1.10     | A               | Blocking for Haulout                                                                                          | \\$2,250 | \\$525    |         | \\$2,775            |\n|          |                 | Pending review of docking plan or vessel request for special requirements.                                    |         |          |         |                    |\n|          |                 | Includes one setup. Additional blocking required for specific tasks will be quoted                            |         |          |         |                    |\n|          |                 | seperately. Bottom areas under bilge blocks to be treated through alternate                                   |         |          |         |                    |\n|          |                 | blocking in a subsequent haulout.                                                                             |         |          |         |                    |\n| 1.11     | A               | Rail car weekly rate \\$240                                                                                    |         |          |         | weekly             |\n| 1.15     | Q               | Diver Services for Haulout                                                                                    |         |          | \\$1,600 | \\$1,600<br>\\$1,824 |\n| 1.20     | Q               | Pressure Wash Bottom at Haulout<br>Note: Standard rate sheet price for machine pressure washing. Scraping and |         |          | \\$1,824 |                    |\n|          |                 | sanding to remove excess marine growth will be priced upon inspection if                                      |         |          |         |                    |\n|          |                 | required.                                                                                                     |         |          |         |                    |\n| 1.08     | A               | Anchors & Chain if required                                                                                   |         |          |         | T&M                |\n|          |                 | Remove Anchor and Chains from Vessel Prior to Haulout and Refit After Launch.                                 |         |          |         |                    |\n|          |                 | Note: Includes labor, floats, tug and crane.                                                                  |         |          |         |                    |\n| 1.30     | A               | Yard Services Fee Daily Rate                                                                                  |         |          |         | daily rate         |\n|          |                 | OFF PEAK (JAN-AUG) \\$228 in water / \\$304 on hard / \\$532 in bldg                                             |         |          |         |                    |\n|          |                 | PEAK (SEP-DEC) \\$532 in water / \\$608 on hard / \\$836 in bldg                                                 |         |          |         |                    |\n|          |                 | Includes water, project management, administrative services, yard security, non                               |         |          |         |                    |\n|          |                 | regulated refuse collection, one stair tower. Additional ISPS/MTSA security                                   |         |          |         |                    |\n|          |                 | services can be arranged at additional cost. Additional stair towers \\$1200                                   |         |          |         |                    |\n|          |                 |                                                                                                               |         |          |         |                    |\n| 1.31     | A               | Live aboard Fee                                                                                               |         |          |         | T&M                |\n|          |                 | \\$1/ft/day live aboard fee may apply on the hard and in building.                                             |         |          |         |                    |\n|          |                 | Liveaboard is not recommended during paint work and is not allowed in the spray                               |         |          |         |                    |\n|          |                 | booth.                                                                                                        |         |          |         |                    |\n| 1.35     | Q               | Shorepower Hookup & Disconnect                                                                                |         |          | \\$175   | \\$175              |\n|          |                 | One time fee for labor, standard hookup to shore connection. Any modifications,                               |         |          |         |                    |\n|          |                 | materials or equipment required will be priced additionally. \\$1000 deposit for use                           |         |          |         |                    |\n|          |                 | of TMI shorepower plug.                                                                                       |         |          |         |                    |\n| 1.36     | Q               | Cooling Tower Hookup & Disconnect                                                                             |         |          | \\$250   | \\$250              |\n|          |                 | One time fee for labor, standard hookup to shore connection. Any modifications,                               |         |          |         |                    |\n|          |                 | materials or equipment required will be priced additionally.                                                  |         |          |         |                    |\n| 1.37     | Q               | Black & Grey Water Hookup & Disconnect                                                                        |         |          | \\$300   | \\$300              |\n|          |                 | One time fee for labor, standard hookup to shore connection. Any modifications,                               |         |          |         |                    |\n|          |                 | materials or equipment required will be priced additionally. Disposal charged                                 |         |          |         |                    |\n| 1.38     | Q               | additionally per rate sheet                                                                                   |         |          |         | monthly            |\n|          |                 | Dedicated Internet Connection<br>Hardwire or Nanobeam as available \\$150 Monthly                              |         |          |         |                    |\n| 1.39     | A               | Sewage Connection in Service Bldg.                                                                            |         |          |         | daily rate         |\n|          |                 | \\$10 Daily as applicable.                                                                                     |         |          |         |                    |\n| 1.40     | A               | Shorepower                                                                                                    |         |          |         | daily rate         |\n|          |                 | Daily Rate per cord based on vessel's requirements. See Rate Sheet.                                           |         |          |         |                    |\n| 1.50     | A               | Air Conditioning Condenser Cooling Tower                                                                      |         |          |         | daily rate         |\n|          |                 | \\$50 Daily Rate                                                                                               |         |          |         |                    |\n| 1.60     | A               | Yard Equipment With Operator                                                                                  |         |          |         | T&M                |\n|          |                 | Hourly per rate sheet. Mandatory assist invoiced additionally at \\$75/hr.                                     |         |          |         |                    |\n| 1.70     | A               | Storage                                                                                                       |         |          |         | T&M                |\n|          |                 | Storage locker or 20 ft. shipping container rental for storage of vessel equipment.                           |         |          |         |                    |\n|          |                 | \\$300 Monthly Rate Per Unit / \\$400 per work space                                                            |         |          |         |                    |\n| 1.80     | A               | Tenders UP TO 32 FT AND 10,000 LBS                                                                            |         |          |         | T&M                |\n|          |                 | Haul & launch tenders by yard crane \\$300 per Tender or two jet skis.                                         |         |          |         |                    |\n|          |                 | Storage \\$150 /month/tender \\$75 /month/jet ski.                                                              |         |          |         |                    |\n|          |                 | Request for special blocking - T&M                                                                            |         |          |         |                    |\n| 1.90     | A               | Hazardous Liquids Disposal                                                                                    |         |          |         | T&M                |\n|          |                 | Disposal of Used Oil, Oily Water, Black & Gray Water, Coolant etc. billed per                                 |         |          |         |                    |\n|          |                 | gallon, see Rate Sheet. Note: Handling & Equipment Fees charged additionally.                                 |         |          |         |                    |\n\n## Date: 28 July 2022 Customer: M/Y Lady May (152f) (46.2m) 2014 Feadship Contact Name: Capt. Lloyd Bernard Phone: +1 305 799 4799 Email: captain@yachtladymay.com Billing Address:\n\nTMI Budget Proposal Revised\n\n| Task No. | Billing<br>Type | Task Description                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      | Labor    | Material | Misc. | Total              |\n|----------|-----------------|---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|----------|----------|-------|--------------------|\n| 1.95     | A               | Foreign Waste Collection & Disposal - As Required<br>Contract IWC on behalf of vessel for collection and disposal of foreign waste/<br>regulated garbage. Vessel must provide a copy of CBP Form AI-288<br>certifying coastwise status as required by government regulations. Without<br>this form all of the vessel's garbage will be considered Regulated Garbage. See<br>arrival package document T-Dept. of Homeland Security U.S. CBP Maritime                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   |          |          |       | T&M                |\n|          |                 | Regulated Garbage Disposal Guidelines                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 |          |          |       |                    |\n| 1.99     | A               | Outside Contractor Facility / Utility Use Fee<br>15% Outside Contractor Facility / Utility Use Fee<br>5% for main engine and generator service contracted directly with vessel.<br>Vessel to present contractor's worklist and schedule prior to access for work<br>being granted. Contractors must submit proof of insurance and have signed<br>agreement on file with TMI. Applies to all outside contractors working directly for<br>vessel in TMI facility. Vendor Warranty Applies.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              |          |          |       | T&M                |\n| .90      | A               | Crew Purchases<br>Note: Dedicated Driver Runs and Materials Research will be billed in addition to<br>materials charge if requested.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  |          |          |       | T&M                |\n| .75      | A               | Shipping & Receiving<br>Note: Custom Crating & Packaging will be Quoted in addition to Shipping<br>Charges if required.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               |          |          |       | T&M                |\n| .25      | A               | General Cover & Protect<br>For areas not addressed by specific work order. Extent of cover and protect for<br>duration of project will be determined by vessel's representative and priced<br>accordingly.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            |          |          |       | T&M                |\n| .10      | A               | Technical Services and Drawings<br>\\$125 Hourly per Rate Sheet                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        |          |          |       | T&M                |\n|          |                 | SUBTOTAL GENERAL SERVICES<br>EXCLUDING VARIABLES & UNKNOWNS                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           |          |          |       | \\$14,254           |\n|          |                 |                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       |          |          |       |                    |\n|          | A               | R&R 26 Valves for Inspection<br>Remove through hull valves/check valves as directed by class surveyor/vessel<br>rep for class Inspection. Clean, check & pressure test valves as directed by<br>Surveyor. Convey valves to shop, wash out & clean valves as necessary for<br>pressure testing. Hydrostatically test valves & furnish Test / Condition Found<br>Report for Vessel & Surveyor. Reinstall valves when directed using new gaskets.<br>Note; Any further service, repairs or replacement parts, or new valves will be<br>quoted from condition found report & addressed with a change order. Allowance<br>of 10 Hours Labor & Misc. Materials per Valve for Twenty Six (26) valves per<br>vessel's request. Removal & replacement of any pipework or Interferences to<br>gain access to valves will be quoted as emergent work upon inspection of vessel.<br>Assumes all parts are in good working order and does not include work on<br>damaged or worn parts or threads. | \\$20,800 | \\$1,092  |       | \\$21,892           |\n|          |                 | SUBTOTAL R&R VALVES<br>EXCLUDING VARIABLES & UNKNOWNS                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 |          |          |       | \\$21,892           |\n|          |                 | ALL OTHER SERVICES WILL BE ADDRESSED ON SEPARATE WORK PROPOSALS                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       |          |          |       |                    |\n|          |                 | 7% Georgia Sales Tax                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  |          |          |       | as applicable      |\n|          |                 | 1.5% Ship Repairer's Liability                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        |          |          |       | as applicable      |\n|          |                 | 1% Environmental Surcharge                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            |          |          |       | as applicable      |\n|          |                 | Freight charges will be added as applicable<br>This proposal is subject to inspection at time of service. Inspection findings may impact costs and schedule. This proposal is inclusive only<br>of work as described. Additions and/or changes will be documented for approval including proposal for pricing and effect on<br>Bi-weekly invoices will be presented during the project. If requested at time of signature for tasks listed for T&M billing, time sheets will be<br>presented daily for review by the vessel's appointed representative. A deposit is required to secure space. This proposal is valid for 30 days.<br>TMI proposals are not valid until signed by a TMI representative after mutual agreement of terms and yard dates, due to the potential for<br>competing projects with similar timeframes requiring the same resources. Invoices must be paid in irrevocable funds and payment received<br>prior to vessel's launch and departure.                |          |          |       | vessel's schedule. |\n|          |                 | THUNDERBOLT MARINE, INC. WORK AUTHORIZATION TERMS AND CONDITIONS, WHETHER PRINTED ON THE REVERSE OF THIS ORIGINAL<br>SIGNATURE PAGE OR SENT AS A SEPARATE PAGE, ARE STIPULATED TO BE PART OF THE AGREEMENT.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           |          |          |       |                    |\n\n| Signed: |                                                                                           | Date: |  |\n|---------|-------------------------------------------------------------------------------------------|-------|--|\n|         | Owner or Authorized Representative                                                        |       |  |\n|         |                                                                                           |       |  |\n| Signed: |                                                                                           | Date: |  |\n|         | For Thunderbolt Marine Inc. Any amount over \\$25,000 must be signed by a company Officer. |       |  |","body_zh":"HK-7\n\n自 1965 年以来位于 Savannah（萨凡纳）附近的 Intracoastal Waterway（内陆沿海水道）旁 P.O. Box 5628 Savannah（萨凡纳）Georgia（佐治亚州）31414\n\n日期：28 July 2022 客户：M/Y Lady May（Lady May 号机动游艇）（152f）（46.2m）2014 Feadship（斐帝星）联系人姓名：Capt. Lloyd Bernard（劳埃德·伯纳德船长）电话：+1 305 799 4799 电子邮箱：captain@yachtladymay.com 账单地址：\n\nTMI（Thunderbolt Marine, Inc.，雷霆海事公司）修订预算提案\n\n任务编号　计费\n类型　任务说明　人工　材料　杂项　合计\n\n上排及一般服务\n1.05　A　上排计划　$1,250　$1,250\n根据船舶提供的图纸制定 TMI Syncrolift 进坞计划\n1.00　Q　使用 Syncrolift 上排及下水　$6,080　$6,080\n1.10　A　上排支墩　$2,250　$525　$2,775\n待审核进坞计划或船舶对特殊要求的请求。\n包括一次设置。特定任务所需的额外支墩将另行报价。\n舱底支墩下方的船底区域将在后续一次上排中通过替代\n支墩方式进行处理。\n1.11　A　轨道车周费率 $240　每周\n1.15　Q　上排潜水员服务　$1,600　$1,600\n$1,824\n1.20　Q　上排时高压清洗船底\n注：机器高压清洗的标准价目表价格。为清除过量海洋附生物而进行的刮除及　$1,824\n打磨，如有需要，将在检查后定价。\n1.08　A　如需要，锚及锚链　T&M\n上排前从船舶拆除锚及锚链，并在下水后重新安装。\n注：包括人工、浮筒、拖船及起重机。\n1.30　A　船厂服务费日费率　日费率\n淡季（JAN-AUG）水中 $228 / 陆地 $304 / 建筑物内 $532\n旺季（SEP-DEC）水中 $532 / 陆地 $608 / 建筑物内 $836\n包括用水、项目管理、行政服务、船厂安保、非\n监管废弃物收集及一座楼梯塔。可安排额外的 ISPS/MTSA 安保\n服务，费用另计。额外楼梯塔 $1200\n\n1.31　A　船员居住费　T&M\n陆地及建筑物内可能适用 $1/ft/day 的船员居住费。\n在油漆作业期间不建议船员居住，且喷漆\n间内不允许居住。\n1.35　Q　岸电接通及断开　$175　$175\n人工一次性费用，按标准方式接通岸上连接。所需的任何改装、\n材料或设备将另行定价。使用 TMI 岸电插头须缴纳 $1000 押金。\n1.36　Q　冷却塔接通及断开　$250　$250\n人工一次性费用，按标准方式接通岸上连接。所需的任何改装、\n材料或设备将另行定价。\n1.37　Q　黑水及灰水接通及断开　$300　$300\n人工一次性费用，按标准方式接通岸上连接。所需的任何改装、\n材料或设备将另行定价。处置费用另行收取。\n1.38　Q　按价目表另行计费　每月\n专用互联网连接\n硬接线或 Nanobeam（纳米波束），视可用情况而定，每月 $150\n1.39　A　服务建筑物内的污水连接　日费率\n视适用情况，每日 $10。\n1.40　A　岸电　日费率\n按船舶需求每根电缆的日费率。见价目表。\n1.50　A　空调冷凝器冷却塔　日费率\n每日费率 $50\n1.60　A　配操作员的船厂设备　T&M\n按价目表按小时计费。强制协助另按 $75/hr 计费。\n1.70　A　储存　T&M\n用于储存船舶设备的储物柜或 20 ft. 集装箱租赁。\n每单位每月费率 $300 / 每个工作空间 $400\n1.80　A　不超过 32 FT 且不超过 10,000 LBS 的小艇　T&M\n由船厂起重机上排及下水小艇，每艘小艇或两艘水上摩托车 $300。\n储存费：每艘小艇 $150 /月，每艘水上摩托车 $75 /月。\n特殊支墩请求 — T&M\n1.90　A　危险液体处置　T&M\n废油、含油水、黑水及灰水、冷却液等的处置按\n加仑计费，见价目表。注：装卸及设备费另行收取。\n日期：28 July 2022 客户：M/Y Lady May（Lady May 号机动游艇）（152f）（46.2m）2014 Feadship（斐帝星）联系人姓名：Capt. Lloyd Bernard（劳埃德·伯纳德船长）电话：+1 305 799 4799 电子邮箱：captain@yachtladymay.com 账单地址：\n\nTMI 修订预算提案\n\n任务编号　计费\n类型　任务说明　人工　材料　杂项　合计\n\n1.95　A　外国废弃物收集及处置 — 按需要\n代表船舶与 IWC 签约，收集及处置外国废弃物/\n受监管垃圾。船舶必须提供 CBP Form AI-288 的副本，\n以证明符合政府法规所要求的沿岸航行状态。未提供\n该表格，船舶的全部垃圾将被视为受监管垃圾。见\n到港文件 T-Dept. of Homeland Security U.S. CBP Maritime　T&M\nRegulated Garbage Disposal Guidelines（国土安全部美国海关和边境保护局海事受监管垃圾处置指南）\n1.99　A　外部承包商设施／公用事业使用费\n外部承包商设施／公用事业使用费 15%\n直接与船舶签约的主机及发电机服务收取 5%。\n船舶应在获准进入作业前提交承包商的工作清单及时间表。\n承包商必须提交保险证明，并与 TMI 签订协议存档。\n适用于在 TMI 设施内直接为船舶工作的所有外部承包商。\n适用供应商保修。　T&M\n.90　A　船员采购\n注：如有要求，专用司机出行及材料调查将在\n材料费用之外另行计费。　T&M\n.75　A　收发货\n注：如有需要，定制装箱及包装将于运费之外\n另行报价。　T&M\n.25　A　一般覆盖及保护\n适用于未由具体工作订单涵盖的区域。项目期间覆盖及保护的\n范围将由船舶代表确定，并据此定价。　T&M\n.10　A　技术服务及图纸\n按价目表每小时 $125　T&M\n一般服务小计\n不包括变量及未知事项　$14,254\n\nA　拆卸及重新安装 26 个阀门以供检查\n按船级社验船师／船舶代表的指示，为船级检查拆卸船体通海阀／止回阀。\n按验船师指示清洁、检查及对阀门进行压力测试。\n将阀门送至车间，并视压力测试需要冲洗及清洁阀门。\n对阀门进行水压测试，并向船舶及验船师提供测试／\n发现状况报告。按指示使用新垫片重新安装阀门。\n注：任何进一步服务、维修或替换部件，或新阀门，将根据发现状况报告\n报价，并通过变更订单处理。根据船舶请求，\n26 个阀门中每个阀门预留 10 小时人工及杂项材料。\n为进入阀门而需拆除及更换的任何管道或障碍物，将在检查船舶后\n作为紧急工作报价。假定所有部件均处于良好工作状态，且不包括\n对损坏或磨损部件或螺纹的工作。　$20,800　$1,092　$21,892\n拆卸及重新安装阀门小计\n不包括变量及未知事项　$21,892\n所有其他服务将通过单独的工作提案处理\n7% Georgia（佐治亚州）销售税　如适用\n1.5% 船舶修理人责任保险　如适用\n1% 环境附加费　如适用\n运费将视适用情况加收\n本提案以服务时检查为准。检查结果可能影响费用及进度。本提案仅包括\n所述工作。增项及／或变更将形成文件供批准，包括定价提案及对\n项目期间将每两周提交一次发票。如在签署时针对按 T&M 计费的所列任务提出要求，工时表将\n每日提交，供船舶指定代表审阅。须缴纳押金以保留场地。本提案有效期为 30 天。\n鉴于可能存在在相近时间段内需要相同资源的竞争项目，TMI 提案在经 TMI 代表于双方就条款及船厂日期达成一致后签署之前\n不具有效力。发票必须以不可撤销资金支付，且付款必须在\n船舶下水及离场之前收到。　船舶的进度。\nTHUNDERBOLT MARINE, INC.（雷霆海事公司）工作授权条款及条件，无论印载于本原件\n签字页背面还是作为单独页面发送，均约定为协议的一部分。\n\n签字：　日期：\n\n船东或授权代表\n\n签字：　日期：\n代表 Thunderbolt Marine Inc. 任何超过 $25,000 的金额必须由公司高级职员签字。","key_entities":["Je"],"ecf_references":[],"word_count":1843,"status":"published","published_at":null,"created_at":null,"updated_at":"2026-08-23 18:46:04"}