{"id":"court_ctb_890_8","court":"CTB","case_no":"22-50073","doc_number":890,"sub_number":8,"doc_type":"EXHIBIT","filed_date":null,"title":"EXHIBIT PAX 08 Exhibit G to Repair Reserve Motion (Thunderbolt Marine Budget Proposal)","summary_zh":null,"summary_en":null,"body_en":"## **EXHIBIT PAX 08**\n\nExhibit G to Repair Reserve Motion (Thunderbolt Marine Budget Proposal)\n\n## **EXHIBIT G**\n\n![](_page_2_Picture_1.jpeg)\n\nJUST OUTSIDE SAVANNAH ON THE INTRACOASTAL WATERWAY SINCE 1965 P.O. Box 5628 Savannah Georgia 31414\n\nDate: 28 July 2022 Customer: M/Y Lady May (152f) (46.2m) 2014 Feadship Contact Name: Capt. Lloyd Bernard Phone: +1 305 799 4799 Email: captain@yachtladymay.com Billing Address:\n\nTMI Budget Proposal Revised\n\n| Task No. | Billing<br>Type | Task Description                                                                               | Labor   | Material | Misc.   | Total      |\n|----------|-----------------|------------------------------------------------------------------------------------------------|---------|----------|---------|------------|\n|          |                 | HAULOUT & GENERAL SERVICES                                                                     |         |          |         |            |\n| 1.05     | A               | Haulout Plan                                                                                   | \\$1,250 |          |         | \\$1,250    |\n|          |                 | Develop TMI Syncrolift Docking Plans From Vessel Supplied Drawings                             |         |          |         |            |\n| 1.00     | Q               | Haul & Float With Syncrolift                                                                   |         |          | \\$6,080 | \\$6,080    |\n| 1.10     | A               | Blocking for Haulout                                                                           | \\$2,250 | \\$525    |         | \\$2,775    |\n|          |                 | Pending review of docking plan or vessel request for special requirements.                     |         |          |         |            |\n|          |                 | Includes one setup. Additional blocking required for specific tasks will be quoted             |         |          |         |            |\n|          |                 | seperately. Bottom areas under bilge blocks to be treated through alternate                    |         |          |         |            |\n|          |                 | blocking in a subsequent haulout.                                                              |         |          |         |            |\n| 1.11     | A               | Rail car weekly rate \\$240                                                                     |         |          |         | weekly     |\n| 1.15     | Q               | Diver Services for Haulout                                                                     |         |          | \\$1,600 | \\$1,600    |\n| 1.20     | Q               | Pressure Wash Bottom at Haulout                                                                |         |          | \\$1,824 | \\$1,824    |\n|          |                 | Note: Standard rate sheet price for machine pressure washing. Scraping and                     |         |          |         |            |\n|          |                 | sanding to remove excess marine growth will be priced upon inspection if                       |         |          |         |            |\n| 1.08     | A               | required.<br>Anchors & Chain if required                                                       |         |          |         | T&M        |\n|          |                 | Remove Anchor and Chains from Vessel Prior to Haulout and Refit After Launch.                  |         |          |         |            |\n|          |                 | Note: Includes labor, floats, tug and crane.                                                   |         |          |         |            |\n| 1.30     | A               | Yard Services Fee Daily Rate                                                                   |         |          |         | daily rate |\n|          |                 | OFF PEAK (JAN-AUG) \\$228 in water / \\$304 on hard / \\$532 in bldg                              |         |          |         |            |\n|          |                 | PEAK (SEP-DEC) \\$532 in water / \\$608 on hard / \\$836 in bldg                                  |         |          |         |            |\n|          |                 | Includes water, project management, administrative services, yard security, non                |         |          |         |            |\n|          |                 | regulated refuse collection, one stair tower. Additional ISPS/MTSA security                    |         |          |         |            |\n|          |                 | services can be arranged at additional cost. Additional stair towers \\$1200                    |         |          |         |            |\n|          |                 |                                                                                                |         |          |         |            |\n| 1.31     | A               | Live aboard Fee                                                                                |         |          |         | T&M        |\n|          |                 | \\$1/ft/day live aboard fee may apply on the hard and in building.                              |         |          |         |            |\n|          |                 | Liveaboard is not recommended during paint work and is not allowed in the spray                |         |          |         |            |\n|          |                 | booth.                                                                                         |         |          |         |            |\n| 1.35     | Q               | Shorepower Hookup & Disconnect                                                                 |         |          | \\$175   | \\$175      |\n|          |                 | One time fee for labor, standard hookup to shore connection. Any modifications,                |         |          |         |            |\n|          |                 | materials or equipment required will be priced additionally. \\$1000 deposit for use            |         |          |         |            |\n|          |                 | of TMI shorepower plug.                                                                        |         |          |         |            |\n| 1.36     | Q               | Cooling Tower Hookup & Disconnect                                                              |         |          | \\$250   | \\$250      |\n|          |                 | One time fee for labor, standard hookup to shore connection. Any modifications,                |         |          |         |            |\n|          |                 | materials or equipment required will be priced additionally.                                   |         |          |         |            |\n| 1.37     | Q               | Black & Grey Water Hookup & Disconnect                                                         |         |          | \\$300   | \\$300      |\n|          |                 | One time fee for labor, standard hookup to shore connection. Any modifications,                |         |          |         |            |\n|          |                 | materials or equipment required will be priced additionally. Disposal charged                  |         |          |         |            |\n|          |                 | additionally per rate sheet                                                                    |         |          |         |            |\n| 1.38     | Q               | Dedicated Internet Connection                                                                  |         |          |         | monthly    |\n|          |                 | Hardwire or Nanobeam as available \\$150 Monthly                                                |         |          |         |            |\n| 1.39     | A               | Sewage Connection in Service Bldg.                                                             |         |          |         | daily rate |\n|          |                 | \\$10 Daily as applicable.                                                                      |         |          |         |            |\n| 1.40     | A               | Shorepower                                                                                     |         |          |         | daily rate |\n|          |                 | Daily Rate per cord based on vessel's requirements. See Rate Sheet.                            |         |          |         |            |\n| 1.50     | A               | Air Conditioning Condenser Cooling Tower                                                       |         |          |         | daily rate |\n| 1.60     | A               | \\$50 Daily Rate                                                                                |         |          |         | T&M        |\n|          |                 | Yard Equipment With Operator                                                                   |         |          |         |            |\n|          |                 | Hourly per rate sheet. Mandatory assist invoiced additionally at \\$75/hr.                      |         |          |         |            |\n| 1.70     | A               | Storage<br>Storage locker or 20 ft. shipping container rental for storage of vessel equipment. |         |          |         | T&M        |\n|          |                 |                                                                                                |         |          |         |            |\n| 1.80     | A               | \\$300 Monthly Rate Per Unit / \\$400 per work space<br>Tenders UP TO 32 FT AND 10,000 LBS       |         |          |         | T&M        |\n|          |                 | Haul & launch tenders by yard crane \\$300 per Tender or two jet skis.                          |         |          |         |            |\n|          |                 | Storage \\$150 /month/tender \\$75 /month/jet ski.                                               |         |          |         |            |\n|          |                 | Request for special blocking - T&M                                                             |         |          |         |            |\n| 1.90     | A               | Hazardous Liquids Disposal                                                                     |         |          |         | T&M        |\n|          |                 | Disposal of Used Oil, Oily Water, Black & Gray Water, Coolant etc. billed per                  |         |          |         |            |\n|          |                 | gallon, see Rate Sheet. Note: Handling & Equipment Fees charged additionally.                  |         |          |         |            |\n|          |                 |                                                                                                |         |          |         |            |\n\nDate: 28 July 2022 Customer: M/Y Lady May (152f) (46.2m) 2014 Feadship Contact Name: Capt. Lloyd Bernard Phone: +1 305 799 4799 Email: captain@yachtladymay.com Billing Address:\n\nTMI Budget Proposal Revised\n\n| Task No. | Billing<br>Type | Task Description                                                                                                                                                                                                                                                                      | Labor    | Material | Misc. | Total              |\n|----------|-----------------|---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|----------|----------|-------|--------------------|\n| 1.95     | A               | Foreign Waste Collection & Disposal - As Required                                                                                                                                                                                                                                     |          |          |       | T&M                |\n|          |                 | Contract IWC on behalf of vessel for collection and disposal of foreign waste/                                                                                                                                                                                                        |          |          |       |                    |\n|          |                 | regulated garbage. Vessel must provide a copy of CBP Form AI-288<br>certifying coastwise status as required by government regulations. Without                                                                                                                                        |          |          |       |                    |\n|          |                 | this form all of the vessel's garbage will be considered Regulated Garbage. See                                                                                                                                                                                                       |          |          |       |                    |\n|          |                 | arrival package document T-Dept. of Homeland Security U.S. CBP Maritime                                                                                                                                                                                                               |          |          |       |                    |\n|          |                 | Regulated Garbage Disposal Guidelines                                                                                                                                                                                                                                                 |          |          |       |                    |\n| 1.99     | A               | Outside Contractor Facility / Utility Use Fee                                                                                                                                                                                                                                         |          |          |       | T&M                |\n|          |                 | 15% Outside Contractor Facility / Utility Use Fee                                                                                                                                                                                                                                     |          |          |       |                    |\n|          |                 | 5% for main engine and generator service contracted directly with vessel.                                                                                                                                                                                                             |          |          |       |                    |\n|          |                 | Vessel to present contractor's worklist and schedule prior to access for work<br>being granted. Contractors must submit proof of insurance and have signed                                                                                                                            |          |          |       |                    |\n|          |                 | agreement on file with TMI. Applies to all outside contractors working directly for                                                                                                                                                                                                   |          |          |       |                    |\n|          |                 | vessel in TMI facility. Vendor Warranty Applies.                                                                                                                                                                                                                                      |          |          |       |                    |\n| .90      | A               | Crew Purchases                                                                                                                                                                                                                                                                        |          |          |       | T&M                |\n|          |                 | Note: Dedicated Driver Runs and Materials Research will be billed in addition to                                                                                                                                                                                                      |          |          |       |                    |\n| .75      | A               | materials charge if requested.<br>Shipping & Receiving                                                                                                                                                                                                                                |          |          |       | T&M                |\n|          |                 | Note: Custom Crating & Packaging will be Quoted in addition to Shipping                                                                                                                                                                                                               |          |          |       |                    |\n|          |                 | Charges if required.                                                                                                                                                                                                                                                                  |          |          |       |                    |\n| .25      | A               | General Cover & Protect                                                                                                                                                                                                                                                               |          |          |       | T&M                |\n|          |                 | For areas not addressed by specific work order. Extent of cover and protect for                                                                                                                                                                                                       |          |          |       |                    |\n|          |                 | duration of project will be determined by vessel's representative and priced<br>accordingly.                                                                                                                                                                                          |          |          |       |                    |\n| .10      | A               | Technical Services and Drawings                                                                                                                                                                                                                                                       |          |          |       | T&M                |\n|          |                 | \\$125 Hourly per Rate Sheet                                                                                                                                                                                                                                                           |          |          |       |                    |\n|          |                 | SUBTOTAL GENERAL SERVICES                                                                                                                                                                                                                                                             |          |          |       | \\$14,254           |\n|          |                 | EXCLUDING VARIABLES & UNKNOWNS                                                                                                                                                                                                                                                        |          |          |       |                    |\n|          | A               | R&R 26 Valves for Inspection                                                                                                                                                                                                                                                          | \\$20,800 | \\$1,092  |       | \\$21,892           |\n|          |                 | Remove through hull valves/check valves as directed by class surveyor/vessel                                                                                                                                                                                                          |          |          |       |                    |\n|          |                 | rep for class Inspection. Clean, check & pressure test valves as directed by                                                                                                                                                                                                          |          |          |       |                    |\n|          |                 | Surveyor. Convey valves to shop, wash out & clean valves as necessary for                                                                                                                                                                                                             |          |          |       |                    |\n|          |                 | pressure testing. Hydrostatically test valves & furnish Test / Condition Found                                                                                                                                                                                                        |          |          |       |                    |\n|          |                 | Report for Vessel & Surveyor. Reinstall valves when directed using new gaskets.<br>Note; Any further service, repairs or replacement parts, or new valves will be                                                                                                                     |          |          |       |                    |\n|          |                 | quoted from condition found report & addressed with a change order. Allowance                                                                                                                                                                                                         |          |          |       |                    |\n|          |                 | of 10 Hours Labor & Misc. Materials per Valve for Twenty Six (26) valves per                                                                                                                                                                                                          |          |          |       |                    |\n|          |                 | vessel's request. Removal & replacement of any pipework or Interferences to                                                                                                                                                                                                           |          |          |       |                    |\n|          |                 | gain access to valves will be quoted as emergent work upon inspection of vessel.                                                                                                                                                                                                      |          |          |       |                    |\n|          |                 | Assumes all parts are in good working order and does not include work on                                                                                                                                                                                                              |          |          |       |                    |\n|          |                 | damaged or worn parts or threads.                                                                                                                                                                                                                                                     |          |          |       |                    |\n|          |                 |                                                                                                                                                                                                                                                                                       |          |          |       |                    |\n|          |                 | SUBTOTAL R&R VALVES                                                                                                                                                                                                                                                                   |          |          |       | \\$21,892           |\n|          |                 | EXCLUDING VARIABLES & UNKNOWNS                                                                                                                                                                                                                                                        |          |          |       |                    |\n|          |                 | ALL OTHER SERVICES WILL BE ADDRESSED ON SEPARATE WORK PROPOSALS                                                                                                                                                                                                                       |          |          |       |                    |\n|          |                 | 7% Georgia Sales Tax                                                                                                                                                                                                                                                                  |          |          |       | as applicable      |\n|          |                 | 1.5% Ship Repairer's Liability                                                                                                                                                                                                                                                        |          |          |       | as applicable      |\n|          |                 | 1% Environmental Surcharge                                                                                                                                                                                                                                                            |          |          |       | as applicable      |\n|          |                 | Freight charges will be added as applicable                                                                                                                                                                                                                                           |          |          |       |                    |\n|          |                 | This proposal is subject to inspection at time of service. Inspection findings may impact costs and schedule. This proposal is inclusive only                                                                                                                                         |          |          |       |                    |\n|          |                 | of work as described. Additions and/or changes will be documented for approval including proposal for pricing and effect on                                                                                                                                                           |          |          |       | vessel's schedule. |\n|          |                 | Bi-weekly invoices will be presented during the project. If requested at time of signature for tasks listed for T&M billing, time sheets will be                                                                                                                                      |          |          |       |                    |\n|          |                 | presented daily for review by the vessel's appointed representative. A deposit is required to secure space. This proposal is valid for 30 days.                                                                                                                                       |          |          |       |                    |\n|          |                 | TMI proposals are not valid until signed by a TMI representative after mutual agreement of terms and yard dates, due to the potential for<br>competing projects with similar timeframes requiring the same resources. Invoices must be paid in irrevocable funds and payment received |          |          |       |                    |\n|          |                 | prior to vessel's launch and departure.                                                                                                                                                                                                                                               |          |          |       |                    |\n|          |                 | THUNDERBOLT MARINE, INC. WORK AUTHORIZATION TERMS AND CONDITIONS, WHETHER PRINTED ON THE REVERSE OF THIS ORIGINAL                                                                                                                                                                     |          |          |       |                    |\n|          |                 | SIGNATURE PAGE OR SENT AS A SEPARATE PAGE, ARE STIPULATED TO BE PART OF THE AGREEMENT.                                                                                                                                                                                                |          |          |       |                    |\n\n| Signed: |                                                                                           | Date: |  |\n|---------|-------------------------------------------------------------------------------------------|-------|--|\n|         | Owner or Authorized Representative                                                        |       |  |\n|         |                                                                                           |       |  |\n| Signed: |                                                                                           | Date: |  |\n|         | For Thunderbolt Marine Inc. Any amount over \\$25,000 must be signed by a company Officer. |       |  |","body_zh":"证据附件 PAX 08\n\n维修准备金动议之附件 G（Thunderbolt Marine 预算提案）\n附件 G\n\n自 1965 年起位于萨凡纳城外的内陆沿岸水道  P.O. Box 5628 Savannah Georgia 31414\n\n日期：28 July 2022  客户：M/Y Lady May（“Lady May”号机动游艇）(152f) (46.2m) 2014 Feadship（斐帝星）  联系人姓名：Capt. Lloyd Bernard（劳埃德·伯纳德船长）  电话：+1 305 799 4799  电子邮箱：captain@yachtladymay.com  账单地址：\n\nTMI（迅雷海事公司）修订预算提案\n\n任务编号　计费\n类型　任务说明　人工　材料　杂项　合计\n\n上坞及一般服务\n1.05　A　上坞计划　$1,250　$1,250\n根据船舶提供的图纸制定 TMI Syncrolift 上坞计划\n1.00　Q　使用 Syncrolift 上坞及下水　$6,080　$6,080\n1.10　A　上坞支垫　$2,250　$525　$2,775\n待审查上坞计划或船舶提出特殊要求。\n包括一次设置。特定任务所需的额外支垫将另行报价\n。舱底支垫下方的船底区域将在后续一次上坞中通过替代性\n支垫进行处理。\n1.11　A　轨道车周费率 $240　每周\n1.15　Q　上坞潜水员服务　$1,600　$1,600\n1.20　Q　上坞时高压清洗船底　$1,824　$1,824\n注：机器高压清洗的标准费率表价格。如需刮除和\n打磨以去除过量海洋附生物，将在检查后另行定价，如\n1.08　A　有需要。\n如需要，锚及锚链　T&M\n在上坞前从船舶拆除锚及锚链，并在下水后重新安装。\n注：包括人工、浮筒、拖船及起重机。\n1.30　A　船厂服务费日费率　日费率\n淡季（JAN-AUG）水中 $228 / 陆地 $304 / 建筑物内 $532\n旺季（SEP-DEC）水中 $532 / 陆地 $608 / 建筑物内 $836\n包括用水、项目管理、行政服务、船厂安保、非\n受管制废弃物收集及一座楼梯塔。可另行安排额外的 ISPS/MTSA 安保\n服务，费用另计。额外楼梯塔 $1200\n\n1.31　A　船上居住费　T&M\n在陆地上及建筑物内可能适用 $1/ft/day 的船上居住费。\n在进行油漆工作期间不建议船上居住，且喷漆\n间内不允许船上居住。\n1.35　Q　岸电接通及断开　$175　$175\n人工一次性费用，标准接通至岸上连接。任何所需的改装、\n材料或设备将另行定价。使用 TMI 岸电插头需缴纳 $1000 押金。\n1.36　Q　冷却塔接通及断开　$250　$250\n人工一次性费用，标准接通至岸上连接。任何所需的改装、\n材料或设备将另行定价。\n1.37　Q　黑水及灰水接通及断开　$300　$300\n人工一次性费用，标准接通至岸上连接。任何所需的改装、\n材料或设备将另行定价。处置费用将\n按照费率表另行收取。\n1.38　Q　专用互联网连接　每月\n视供应情况提供有线连接或 Nanobeam，每月 $150\n1.39　A　维修服务楼内污水连接　日费率\n按适用情况每日 $10。\n1.40　A　岸电　日费率\n每条电缆的日费率根据船舶要求确定。见费率表。\n1.50　A　空调冷凝器冷却塔　日费率\n1.60　A　$50 日费率　T&M\n配备操作员的船厂设备\n按费率表按小时计费。强制协助按 $75/hr 另行开具发票。\n1.70　A　储存\n用于储存船舶设备的储物柜或 20 ft. 集装箱租赁。　T&M\n\n1.80　A　每单位每月 $300 费率 / 每个工作空间 $400\n最多 32 FT 且 10,000 LBS 的附属艇　T&M\n由船厂起重机将附属艇上岸及下水，每艘附属艇或两辆水上摩托车 $300。\n储存费：附属艇 $150 /month/艘，水上摩托车 $75 /month/辆。\n特殊支垫要求 - T&M\n1.90　A　危险液体处置　T&M\n废油、含油水、黑水及灰水、冷却液等的处置按\n加仑计费，见费率表。注：装卸及设备费用另行收取。\n\n日期：28 July 2022  客户：M/Y Lady May（“Lady May”号机动游艇）(152f) (46.2m) 2014 Feadship（斐帝星）  联系人姓名：Capt. Lloyd Bernard（劳埃德·伯纳德船长）  电话：+1 305 799 4799  电子邮箱：captain@yachtladymay.com  账单地址：\n\nTMI（迅雷海事公司）修订预算提案\n\n任务编号　计费\n类型　任务说明　人工　材料　杂项　合计\n\n1.95　A　外国废弃物收集及处置——按需　T&M\n代表船舶与 IWC 签约，收集及处置外国废弃物/\n受管制垃圾。船舶必须提供政府法规所要求的、证明沿岸航行身份的\nCBP Form AI-288 副本。没有\n该表格，船舶的所有垃圾将被视为受管制垃圾。见\n抵达资料文件 T-美国国土安全部 U.S. CBP 海事\n受管制垃圾处置指南\n1.99　A　外部承包商设施／公用设施使用费　T&M\n15% 外部承包商设施／公用设施使用费\n直接与船舶签约的主发动机及发电机服务收取 5%。\n船舶须在获准进入开展工作前提交承包商的工作清单及进度安排\n。承包商必须提交保险证明，并与 TMI 签署协议\n并存档。适用于在 TMI 设施内直接为\n船舶工作的所有外部承包商。适用供应商保修。\n.90　A　船员采购　T&M\n注：如提出要求，专属司机出行及材料调研将额外\n.75　A　按材料费用计费。\n货运及收货　T&M\n注：如有需要，定制装箱及包装将除运输\n费用外另行报价。\n.25　A　一般覆盖及保护　T&M\n适用于未由具体工作指令涵盖的区域。项目期间的覆盖及保护范围\n将由船舶代表确定并据此定价。\n.10　A　技术服务及图纸　T&M\n按费率表每小时 $125\n一般服务小计　$14,254\n不包括可变事项及未知事项\nA　为检查而拆卸及重新安装 26 个阀门　$20,800　$1,092　$21,892\n按船级社验船师／船舶代表的指示，为船级检查拆除船底阀／止回阀\n。按验船师指示清洁、检查及对阀门进行压力测试\n。将阀门送至车间，按压力测试需要冲洗及清洁阀门\n。对阀门进行水压测试，并向船舶及验船师提供测试／发现状况\n报告。按指示使用新垫片重新安装阀门。\n注；任何进一步服务、维修或更换零件，或新阀门，将根据\n发现状况报告另行报价，并通过变更命令处理。根据\n船舶要求，对二十六（26）个阀门中的每个阀门预留 10 小时人工及杂项材料\n。为获得阀门通道而需拆除及更换的任何管道或障碍物\n，将在检查船舶后作为紧急工作另行报价。\n假定所有部件均处于良好工作状态，且不包括对\n损坏或磨损的部件或螺纹所进行的工作。\n\n阀门拆卸及重新安装小计　$21,892\n不包括可变事项及未知事项\n所有其他服务将通过单独的工作提案处理\n7% Georgia 销售税　按适用情况\n1.5% 船舶维修商责任保险　按适用情况\n1% 环境附加费　按适用情况\n运费将按适用情况另行添加\n本提案须在服务时接受检查。检查结果可能影响费用及进度。本提案仅包括\n所述工作。任何增加和／或变更均将形成文件供批准，包括定价提案及对船舶进度的影响。\n项目期间将每两周提交一次发票。如在签署时提出要求，对于列为 T&M 计费的任务，工时表将\n每日提交供船舶指定代表审阅。须缴纳押金以预留场地。本提案有效期为 30 天。\n由于可能存在时间范围相近且需要相同资源的竞争性项目，TMI 提案须经双方就条款及船厂日期达成一致后，\n由 TMI 代表签署方为有效。发票必须以不可撤销资金支付，且须在\n船舶下水及离开前收到付款。\nTHUNDERBOLT MARINE, INC.（迅雷海事公司）工作授权条款及条件，无论印在本原始\n签署页背面或作为单独页面发送，均约定为协议的一部分。\n\n签署：　日期：\n\n船东或授权代表\n\n签署：　日期：\n代表 Thunderbolt Marine Inc.（迅雷海事公司） 任何超过 $25,000 的金额必须由公司高级管理人员签署。","key_entities":["Je"],"ecf_references":[],"word_count":2180,"status":"published","published_at":null,"created_at":null,"updated_at":"2026-08-23 18:40:31"}