# Guo Wengui / Miles Guo — bankruptcy case · DECLARATION · ECF #203-3



EXHIBIT

C
UNITED STATES BANKRUPTCY COURT DISTRICT OF CONNECTICUT BRIDGEPORT DIVISION

In re:　Chapter 11

HO WAN KWOK,　Case No: 22-50073 (JAM)
Debtor.

PACIFIC ALLIANCE ASIA OPPORTUNITY
FUND, L.P.,　Contested Matter
[Doc. No. 57]
Movant,
v.
HO WAN KWOK,
Respondent.
DECLARATION OF RUSSELL STOCKIL

I, Russell Stockil, hereby declare as follows:

1. I am the Yacht Management Director for Yachtzoo SARL ("Yachtzoo"), the yacht management company for the vessel, the "Lady May," and I am personally involved in the daily management of the Lady May. As such, I have personal knowledge of the facts set forth in this declaration.

2. HK International Funds Investments (USA) Limited, LLC and Yachtzoo signed a management contract with respect to the Lady May on May 1, 2021. That contract requires Yachtzoo to provide financial administration, technical support and management, safety management, and human resources services for the Lady May's crew members. Yachtzoo continues to perform under that contract.

3. The Lady May is currently alongside the shipyard MB92 La Ciotat SAS ("MB92"), 46 Quai François Mitterrand, 13600 La Ciotat, France, and completing service and
maintenance tasks that can be completed in water – such as HVAC servicing, duct cleaning, servicing of lifesaving appliances and firefighting equipment. A true and genuine copy of the original Quotation dated March 16, 2022, provided by MB92 is appended hereto as Exhibit 1. The time frame set forth in the Quotation was estimated before the discovery of the sea inlet valve issue described below.

4. The timing of such service had originally been dictated by a necessary stabilizer service. Stabilizers are an integral part of the vessel's operation. In this instance, stabilizer service became necessary because an unusual noise was observed emitting from the stabilizers. The stabilizer service is also considered mandatory at this time because there was no record of a prior service and oil change.

5. The stabilizer service must be carried out by the stabilizer's manufacturer, Quantum Marine Stabilizer ("Quantum"). Quantum dictated the schedule based on its availability. We requested stabilizer service from Quantum in December 2021 and paid a deposit on 22nd December 2021 to secure the stabilizer service as soon as possible. Their earliest availability dictated by Quantum was 21st April 2022. A true and genuine copy of the Estimate dated December 9, 2021, provided by Quantum is appended hereto as Exhibit 2.

6. As soon as this stabilizer service is completed, there will be a sea trial to confirm correct function and then the Lady May will be hauled out of the water to complete other engineering work, including (but not limited to) as follows:

- a. Overboard valves (the scope of this service is still under discussion and this matter could potentially increase the time required in the drydock);
- b. Antifouling;
- c. Clearance measurements for rudder and propeller shafts (need to confirm that they are within the stipulated ranges);
- d. Tank cleaning, inspections and repair (grey/black/water);
- e. Anode replacements;
- f. Windlass service and anchor chain inspection; and
- g. Sea inlet valves replacement.

7. With respect to the replacement of the sea inlet valve (item g above), the bolts on the valves are rusted. Unbolting them will be very difficult and some bolts may need to be cut, causing damage to the surrounding elements. There is also a possibility that the hull flanges and filter may be corroded which would then necessitate their replacement. Considering the bolts' and valves' conditions, it will take a minimum of 3 weeks to complete this work assuming the best case scenario and that no cutting and no welding will be necessary. Worst case scenario, this work may require at least 6 weeks in drydock. During this sea inlet valve replacement work, no other work can be done in the engine room. A true and genuine copy of the See Inlet Valves Replacement report is appended hereto as Exhibit 3. As a consequence, the originally contemplated schedule for service and maintenance may be delayed.

8. These services and maintenance are essential to the proper functioning of the vessel and necessary to avoid more complicated and costly issues in future operation as well as to ensure the safety of the passengers and crew.

9. Once the services, maintenance and repairs described above are complete, annual surveys by the vessel Class Society (Lloyds Register) and Flag State (Cayman Islands) are due to be carried out. These will be scheduled based on the progress of the shipyard period and conducted during the final period of the stay at La Ciotat shipyard. These surveys consist of an annual Hull and Machinery survey, Annual Large Yacht Code Compliance (safety) survey, annual safety radio survey, and annual Marine Pollution (air and oil) surveys.

10. In the absence of any unanticipated delays, it is presently expected that the Lady May will be available for travel from France in June, 2022.
11. However, given the design characteristics of the vessel, the Lady May is not capable of safely voyaging across the Atlantic Ocean to the United States of America. Accordingly, it must be transported in a freighter. Arrangements are currently being made for such freighter transportation to take place as soon as the service and maintenance is complete.

12. Ordinarily, it takes approximately 12 to 15 days to load a yacht onto a freighter and transport the yacht by freighter from the South of France, across the Atlantic Ocean to New York or Baltimore. Baltimore is presently the discharge port for the transport freighter. From there, the Lady May can proceed directly to Connecticut.

13. Assuming everything proceeds without any extenuating circumstances causing a delay, including the timely loading of the Lady May onto a freighter, I reasonably anticipate that the Lady May should arrive in the navigable waters of Connecticut by 1st July, 2022.

Pursuant to 28 U.S.C. § 1746, I declare under penalty of perjury under the laws of the United States of America that the forgoing is true and correct.

Dated: April 10, 2022

Russell Stockil
EXHIBIT 1

Case 22-50073 Doc 203-3 Filed 04/11/22 Entered 04/11/22 12:34:01 Page 7 of 50
Section Lady May - O79 - Spring 2022
Section 000 - Yard Services
Section 005 - Arrival Formalities

Ref: MYY-005220316-V3 Date: 16 March 2022

Quote:	005	-	Arrival	Formalities
Title:	Project	Details

Vessel	Name　MY	Lady	May
Contact	Name　Momchill	Ivanov
Contact	Email　captain@yachtladymay.com
Date　Sat	16	Mar	02
Author　P. Bernard
Dates
Estimated	Date	of	Arrival　Wed	23	Mar	22
Estimated	Date	of	Departure　Wed	18	May	22
Estimated	Haul	Out	Date　Fri	29	Apr	22
Estimated	Launch	Date　Sun	15	May	22
Vessel	Details
IMO	Number　1012359
Class　Lloyds	Register
Flag　Cayman	Islands
Year	of	Completion　2014
Hull	Construction　Aluminium
Superstructure	Construction　Aluminium
Builder　Feadship
Dimensions
LOA　46.2	m
Beam　9.0	m
Draught　2.4	m
Displacement
Gross	Tonnage　406t

Section 006 - Customs

Ref: MYY-006220316-V3 Date: 16 March 2022

Type: Pro Rata
MB92 Specification

- Temporary shipyard importation formalities will allow the vessel to be invoiced HT (without tax), this is only applicable to vessels registered outside of the EU.
- Temporary shipyard importation formalities will not exempt the vessel from payment of tax on the following items; State supplied services (electricity, water and rubbish), items purchased directly by the vessel, services conducted outside of the shipyard and/or any travel expenses.
- Valuable objects such as artworks or potentially restricted items such as morphine, shells or exotic animal products should only be brought into France with their accompanying documentation (invoice, certificate of authenticity, etc.)
Quote: 006 - Customs Type: Pro Rata Period: Initial Offer

Description　Qty　Un　Unit
Price　Total
Price

Vessel	Customs	Arrival	Formalities　1　un　€400　€400
Discount　20　%　€-80.00　€-80.00
Ship	Sanitation	Certification　un　€650
Shipyard	"PA"	VAT	Exemption	Fee　0.2　%　€0.00
Minimum	Invoiceable	Amount	750€

VAT exemption to be calculated as 0.2% on final invoice value if required
Total
Section 009 - Insurance Contribution

Ref: MYY-009220316-V3 Date: 16 March 2022
MB92 Specification

The payment of the Insurance contribution depends on the level of the Insurance coverage you subscribe.

You can choose between 3 Waivers of Insurance: 3M €, 5M € or 10M €\*.

Please liaise with your insurers to ensure the Waiver of Insurance is countersigned before your arrival.

\* 10M € Waiver - upon request and subject to MB92 approval

Quote: 009 - Insurance Contribution Title: % To Be Billed on Final Invoice Type: Pro Rata Period: Initial Offer

Description　Qty　Un　Unit
Price　Total
Price

3M	€	Waiver	-	To	be	levied	on	final	invoice	amount　1.25　%
5M	€	Waiver	-	To	be	levied	on	final	invoice	amount　1.5　%
*10M	€	Waiver	-	To	be	levied	on	final	invoice	amount　1.75　%
Total　€0.00

Section	010	-	Vessel	Services

Section	011	-	Alongside	Dockage

Ref: MYY-011220316-V3 Date: 16 March 2022

Type: Pro Rata

Type: Pro Rata

€320
MB92 Specification

Dock place allocation will be made on acceptance of the vessel in an alongside berth.
Notes

7 days alongside are offered to finish the quotation process.

Quote: 011 - Alongside Dockage Title: Dockage & Line Handling Type: Pro Rata Period: Initial Offer

Description　Qty　Un　Unit
Price　Total
Price

Alongside	Dockage　42　dy　€280　€11,760
7	days	alongside	offered	to	finish	quotation	process　-7　dy　€280　€-1,960
Line	Handling	-	Arrival　1　un　€150　€150
Line	Handling	-	Departure　1　un　€150　€150
Total　€10,100

Section	013	-	Electricity	Connect	&	Supply

Ref:	MYY-013220316-V3　Date:	16	March	2022　Type:	Pro	Rata

MB92 Specification

All shore power requirements will be provided by the client prior to arrival.

Quote:	013	-	Electricity	Connect	&	Supply
Type:	Pro	Rata
Period:	Initial	Offer

Description　Date　Qty　Un　Unit
Price　Total
Price
Electricity	Connect	-	Arrival　1　un　€277　€277
Electricity	Disconnect	-	Departure　1　un　€185　€185
Electricity	kWh	Price　0　kWh　€0.29
Total　€462

Section	014	-	Fresh	Water	Connect	&	Supply

Ref: MYY-014220316-V3 Date: 16 March 2022
MB92 Specification

Number of hose connections required to be specified by client prior to arrival.

Quote:	014	-	Fresh	Water	Connect	&	Supply
Type:	Pro	Rata
Period:	Initial	Offer

Description　Date　Qty　Un　Unit
Price　Total
Price
Water	Connect	-	Arrival　1　un　€100.00　€100.00
Water	Disconnect	-	Departure　1　un　€50.00　€50.00
Water	m³	Price　0　m³　€4.20
Total　€150

Section	015	-	Rubbish	&	Waste	Disposal

Ref:	MYY-015220316-V3　Date:	16	March	2022

Type: Pro Rata

Type: Pro Rata
MB92 Specification

This quote assumes a waste disposal system which includes recycling facilities within the yard. For a dedicated bin recycling system, please inquire prior to arrival.

Quote: 015 - Rubbish & Waste Disposal Type: Pro Rata Period: Initial Offer

Description　Qty　Un　Unit
Price　Total
Price

Waste	Management	and	Recycling　57　dy　€11.00　€627
5m³	Skip	per	Emptying　0　un　€315
15m³	Skip	per	Emptying　0　un　€597
30m³	Skip	per	Emptying　0　un　€870
Chemical	Waste	Disposal	(paint	etc.)　0　litres　€1.41
Total　€627
Section 016 - Environmental Monitoring

Ref:	MYY-016220316-V3　Date:	16	March	2022

Type: Pro Rata
MB92 Specification

All vessels are required to conduct a safety awareness briefing on arrival and to sign off the security plan.

Quote:	016	-	Environmental	Monitoring
Type:	Pro	Rata
Period:	Initial	Offer

Description　Qty　Un　Unit
Price　Total
Price
Fire	and	Security	Plan	(incl.	Briefing)	on	Arrival　1　un　€290　€290
Health,	Safety	and	Environmental	Compliance	&	Monitoring　57　dy　€35.00　€1,995
PERMITS	TO	WORK
Permit	for	Enclosed	Spaces　un　€140
Permit	for	Hot	Works　un　€50.00
Permit	for	Works	Aloft　un　€50.00
Permit	for	Diving　un　€50.00
Total　€2,285

Section	031	-	Container	&	Office	Rental

Ref:	MYY-031220316-V3　Date:	16	March	2022　Type:	Pro	Rata
MB92 Specification

All office and storage fees will be billed on a pro rata basis.

Prices shown are for the supply of containers to a single location in the shipyard. Subsequent movements requested around the shipyard will be invoiced additionally.

Container shelving will be quoted on a case by case basis.

Quote:	031	-	Container	&	Office	Rental

Type:	Pro	Rata
Period:	Initial	Offer

Description　Qty　Un　Unit
Price　Total
Price

CONTAINERS
x	40'	Container(s)	Rental　57　dy　€22.00
x	40'	Owner	Supply	Container(s)	Ground	Rental　57　dy　€15.00
40'	Container(s)	Return	Delivery　un　€540
x	20'	Container(s)	Rental　57　dy　€11.00
x	20'	Owner	Supply	Container(s)	Ground	Rental　57　dy　€7.00
20'	Container	Return	Delivery　un　€473
OFFICES	&	FACILITIES
x	20'	Portacabin	Office(s)	Rental　57　dy　€13.00
x	20'	Canteen(s)	for	15	People　57　dy　€11.00
x	20'	Changing	Room(s)	for	15	People　57　dy　€12.00
20'	Block	Return	Delivery　0　un　€300
20'	Block	Installation	&	Dismantling　0　un　€788
REFRIGERATION
x	10'	Refrigerator/Freezer	Container(s)	Rental　57　dy　€30.00
10'	Refrigerator/Freezer	Return	Delivery　un　€1,050
Total　€0.00

Section	033	-	Internet	Connection

Ref:	MYY-033220316-V3　Date:	16	March	2022　Type:	Pro	Rata
MB92 Specification

In addition to the guest shipyard wifi, hi-speed internet can be provided at all locations around the shipyard. Fibre optic access is available in certain berths, please inquire for further details.

Quote:	033	-	Internet	Connection
Title:	Optional
Type:	Pro	Rata
Period:	Initial	Offer
Description　Qty　Un　Unit
Price　Total
Price

Connection/Setup　1　un　€350　€350
Daily	internet	Access	Fee　57　dy　€5.20　€296
Total　€646
Section 048 - Standard Labour
Ref: MYY-048220316-V3 Date: 16 March 2022

Type: Pro Rata
Project Management Fee

A Project Management and Technical Team will be dedicated to Lady May and would be composed of a lead PM, additional PMs and foremen – all of whom will be assisted by our internal Paint Surveyor

and our technical office.

This can be fine-tuned according to the final approved scope of works.

Lead PM will be dedicated to the project from start to finish except in case of Force Majeure or Health/Family Reasons.
Notes

Rates listed are for MB92 La Ciotat staff only and do not apply to any sub-contracted labour rates.

- Internal labour may be supplied only at the discretion of MB92 La Ciotat .
- Except where specifically included in quotes, all labour hours including (but not limited to) concierge, designers, engineering and technical supervision will be billed on a pro rata basis.
- All works listed in this quote are based on Normal Hours. Unless mentioned otherwise, works outside of these hours will be invoiced as per the following timetable:

Normal Hours [x1.0]

Monday to Friday 08:00 to 17:00

Overtime 1 [x1.25]

Monday to Friday 17:00 to 22:00

Overtime 2 [x1.50]

Saturday

Double Time [x2.0]

- Monday to Saturday after 22:00
- Sunday
- National holidays
Quote: 048 - Standard Labour Title: MB92 La Ciotat Internal Labour Rates Type: Pro Rata Period: Initial Offer

Description　Qty　Un　Unit
Price

MB92	Internal	Labour	-	Carpenter　hr　€65.00
MB92	Internal	Labour	-	Composite　hr　€65.00
MB92	Internal	Labour	-	Designer　hr　€90.00
MB92	Internal	Labour	-	Diver　hr　€280
MB92	Internal	Labour	-	Electricity　hr　€65.00
MB92	Internal	Labour	-	Engineering　hr　€85.00
MB92	Internal	Labour	-	General　hr　€50.00
MB92	Internal	Labour	-	Hardware　hr　€58.00
MB92	Internal	Labour	-	HSE　hr　€70.00
MB92	Internal	Labour	-	Machining　hr　€85.00
MB92	Internal	Labour	-	Mechanic　hr　€80.00
MB92	Internal	Labour	-	Metal	Work　hr　€80.00
MB92	Internal	Labour	-	Plumbing　hr　€65.00
MB92	Internal	Labour	-	Stores　hr　€45.00
Quote: 048 - Standard Labour Title: % of Project Management to be Billed on Final Invoice Type: Pro Rata Period: Initial Offer Description Qty Un Unit

Description　Qty　Un　Unit
Price　Total
Price

To	be	levied	on	final	invoice	amount　3　%　€0.00
Total　€0.00

Section	049	-	Forklift	&	Crane	Crew	Items

Ref:	MYY-049220316-V3　Date:	16	March	2022　Type:	Pro	Rata
MB92 Specification

- These items will be invoiced on a time and materials basis.
- All equipment rates include a driver, except scissor lifts.
- Equipment listed below may not be driven by non-MB92 employees unless they have the required permits.
- Crane rates may be negotiable if rented on a long term bases.
- Cranes operated after 21:00 on Weekdays, Saturday, and Sunday are subject to an additional charge.
Quote: 049 - Forklift & Crane Crew Items Title: MB92 La Ciotat Equipment Rates Type: Pro Rata Period: Initial Offer

Description　Qty　Un　Unit
Price　Total
Price

1.5t	Forklift　hr　€75.00
2.5t	Forklift　hr　€90.00
6t	Forklift　hr　€100.00
4t	Telescopic	Forklift　hr　€130
10t	Flat-bed	Truck　hr　€100.00
45t	Mobile	Crane　hr　€170
70t	Mobile	Crane　hr　€240
100t	Mobile	Crane　hr　€290
120t	Mobile	Crane　dy　€3,900
160t	Mobile	Crane　dy　€4,500
16m	Cherry	Picker　dy　€164
Return	Delivery	16m	Cherry	Picker　un　€350
Total　€0.00

€0.00

Type: Pro Rata
Section 052 - Shipyard Access - Owner's Contractors

Ref: MYY-052220316-V3 Date: 16 March 2022

MB92 Specification

- The vessel may request entry into the shipyard for directly engaged sub-contractors (i.e. MB92 La Ciotat does not pay them) up to a maximum value of 10% of the total amount invoiced by MB92 La Ciotat.
- For each vessel direct contractor there will be a one-off administrative charge per person to cover the process of checking their fiscal and insurance status. This is to ensure that any future exposure is minimised, as well as for providing the shipyard access badge.
- An additional daily rate per person will be levied as contribution to the site development and investment made by the companies based in the shipyard.
Notes

- Daily fees are based on Monday to Friday only (5 day working week)
- Any directly engaged contractors must conform to the requirements laid out in the document "Owner's Contractor Requirements" which will be provided upon arrival by default or if requested.
- Due to the varying implications concerning warranty, social security payment liabilities, on site health and safety, and payment conditions, MB92 La Ciotat is obliged to discuss any handling of the Owner's Contractors on a case by case basis.
Exclusions

- Any handling of materials tools or other equipment supplied or received from any Owner's Contractor
- Fees do not include any management or support to any Owner's Contractor.

Company　Qty　Un　Unit
Price　Total
Price

0　un　€100.00
€0.00

Company　Qty　Un　Unit
Price　Total
Price
0　dy　€75.00

MI

€0.00

Type: Fixed Price

Section 060 - Docking

Total

Section 061 - Haul Out & Launch
Ref: MYY-061220316-V3 Date: 16 March 2022
MB92 Specification

- All docking and associated fees will be billed on a pro rata basis.
- All dry docking operations are weather dependent.
- All dry docking operations are subject to signature of docking plan before commencement of operation.
- Price for chocking is with a maximum keel chock height of 500mm. If an increased chocking height is required for
rudder, stabilizer, shaft or other works this will be invoiced additionally.
Quote: 061 - Haul Out & Launch Type: Fixed Price Period: Initial Offer

Description　Qty　Un　Unit
Price　Total
Price

2000t	Synchro	Lift　1　un　€12,000　€12,000
Block	Preparation	&	Line	Handling　1　un　€2,670　€2,670
Design	Hours	for	Docking	Plan　1　un　€320　€320
Divers	for	Verifications　1　un　€1,470　€1,470
Cleaning	Area	after	Launch　5　hr　€50.00　€250
Total　€16,710

Section	062	-	Daily	Hardstanding

Ref:	MYY-062220316-V3　Date:	16	March	2022　Type:	Pro	Rata
MB92 Specification

Hardstanding rates will be invoiced on a pro rata basis.

Quote:	062	-	Daily	Hardstanding

Type:	Pro	Rata
Period:	Initial	Offer

Description　Qty　Un　Unit
Price　Total
Price

Ground	Rental	on	Hard　17　dy　€455　€7,735
Total　€7,735

Section	063	-	Access	Tower

Ref:	MYY-063220316-V3
Date:	16	March	2022　Type:	Pro	Rata
MB92 Specification

According to health and safety regulations a scaffolding boarding access will be provided with steps.

Could be revised if additional access tower is required for safety reason.

To billed on a pro rata basis.

Quote:	063	-	Access	Tower
Type:	Pro	Rata

Description　Qty　Un　Unit
Price　Total
Price
Access	Tower	Installation　1　un　€529　€529
Access	Tower	Rental	-	Based	on	1	off　17　dy　€20.00　€340
Total　€869

Section	064	-	Fire	Main

Ref:	MYY-064220316-V3　Date:	16	March	2022　Type:	Pro	Rata
MB92 Specification

A single standard ISC fresh water fire connection is obligatory for all vessels.

Type: Pro Rata
To billed on a pro rata basis.

Quote:	064	-	Fire	Main
Type:	Pro	Rata

Description　Qty　Un　Unit
Price　Total
Price
Fire	Main	Installation　1　un　€48.00　€48.00
Fire	Main	Maintenance　17　dy　€25.00　€425
Total　€473

Section	065	-	Grey	&	Black	Water	Disposal

Ref: MYY-065220316-V3 Date: 16 March 2022
MB92 Specification

Grey and black water solutions are dependent on the vessels location in the shipyard, this quote is linked only to the vessel's position on the hardstanding and does not apply to vessels in the water.

To billed on a pro rata basis.

Quote:	065	-	Grey	&	Black	Water	Disposal
Type:	Pro	Rata

Description　Type　Qty　Un　Unit
Price　Total
Price
Grey	&	Black	Water	System	Connection　1　un　€265　€265
Grey	Water	System	Maintenance	Fee　17　dy　€25.00　€425
Grey	Water	Disposal	-	Incl.	in	Maintenance	Fee	(Direct	to	Filtration	System)　un　€0.00
Total　€690
Section	066	-	Seawater	Cooling

Type: Pro Rata Ref: MYY-066220316-V3 Date: 16 March 2022
MB92 Specification

- Cooling water will be supplied at approximately 1.5 bar.
- To billed on a pro rata basis.
Notes

- Seawater Cooling connection & disconnection will be carried out in Time & Material
- Cooling Tower size will be determined according to the vessel requirements
- Cooling Tower size could be reassessed upon final inspection on board
- Fresh Water consumption will be charged according to section 014
Exclusions

Supply of chemical product for cleaning - recycling
Quote: 066 - Seawater Cooling Type: Pro Rata

Description　Qty　Un　Unit
Price　Total
Price

Seawater	Cooling	Connection	&	Disconnection　1　un　T&M
Cooling	tower	type	1	-	Small	Tower	:	10m3/hour　17　dy　€65.00　€1,105
Cooling	tower	type	2	-	Large	Tower	:	25m3/hour　0　dy　€75.00
Total　€1,105

Section	071	-	D0084	-	Protection

Ref:	MYY-071220316-V3
Date:	16	March	2022　Type:	Budgetary	Estimate
Client Specification

Deck protection once yacht is out of the water- Swimming platform , Main deck sides and MD aft
MB92 Specification

External protection of the vessel as per client specification

- TEMPORARY PROTECTION as per GA
	- Teak protection with outside carpet 120 m²
		- Manpower
		- Material, product and fees
- Bulkheads and windows on 1.2m
Notes

- Quote to be issued following confirmation/ agreement of exact scope of works and subsequent inspection, at which time various options will be presented.
- Level of maintenance requirement to be determined and agreed at time of works.
Quote: 071 - Protection Type: Budgetary Estimate Period: Initial Offer

Description　Qty　Un　Unit
Price　Total
Price

Teak	protection	with	outside	carpet	120	m²	-	Labour　1　un　€1,248　€1,248
Teak	protection	with	outside	carpet	120	m²	-	Material　1　un　€1,846　€1,846
Bulkheads	and	windows	on	1.2m　1　un　€2,782　€2,782
Megaboard	proplex　20　un　€6.68　€134
Total　€6,010

Section 100 - Class and Flag
Section 106 - E0113 - Valve Pressure Testing

Ref: MYY-106220316-V3 Date: 16 March 2022
Client Specification

- Trough hull valves
- Take off , clean and replace if necessary
- Following is to be looked at :
	- V4020 - Overboard Cooling Water - Globe DN65
- V4036 - Exhaust Overboard - Globe DN150
- V4021 - Overboard - Globe DN80
- V4051 - Sea inlet - Gate DN50
- V4001 - Sea inlet - Butterfly DN300
- V4003 - Sea Inlet - Butterfly DN250
- V4023 - Overboard - Globe DN32
- V4024 - Overboard - Globe DN32
- V4002 - Sea Inlet - Butterfly DN300
- V4004 - Sea Inlet - Butterfly DN250 V4052 - Sea Inlet - Gate DN50
- V4026 - Overboard - Globe DN32
- V4035 - Exhaust Overboard - Globe DN150
- V4025 - Overboard Cooling Water - Globe DN65
MB92 Specification

Removal, cleaning, and testing of valves
Scope of Works

Butterfly/Ball Valves

- Removal of valves
- Cleaning of boat flanges
- Cleaning of the valve at the workshop an reassembling
- Hydraulic test on bench at 6 bars with report
- Re-installation on board of existing valve if test is acceptable, or with new valve supplied by shipyard
- Cleaning of working area
Globe & Gate Valves

- Removal of valves
- Cleaning of boat flanges
- Dismounting of valve at the workshop
- Cleaning of all interior parts
- Grinding of seat and disc
- New packing and seals
- Reconditioning of nuts, bolts and studs
- Re-assembling and re-installation on board
- Hydraulic test on bench at 6 bars with report
- Cleaning of working area
Notes

- Assumes all parts are in good working order and does not include work on damaged or worn parts or threads
- Assumes free access to all valves for removal and does not include the removal of any peripheral equipment or piping

- Purchase or replacement of valves, gaskets, or any other parts not mentioned above
- Difficult access - estimated
- Removal of pipes, flooring, or wall covers
- Polyester powder coating for any parts
- Plastification
- Replacement of bolting with A4 stainless steel
- Painting, repairs, replacement of any damaged mounting hardware such as threaded rod, nuts and bolts
- Painting of valves:
	- Full system with offshore paint - protection, blasting, 1 layer of zinc, 1 layer of primer, 2 layers of finish
	- Single layer of white paint - Sanding, protection, and 1 layer of white paint

Quote:	106	-	Valve	Pressure	Testing
Period:	Initial	Offer

Description　Type　Qty　Un　Unit
Price　Total
Price
V4020	-	Overboard	Cooling	Water	-	Globe	DN65　DN65_Globe　1　un　€546　€546
V4036	-	Exhaust	Overboard	-	Globe	DN150　DN150_Globe　1　un　€924　€924
V4021	-	Overboard	-	Globe	DN80　DN80_Globe　1　un　€626　€626
V4051	-	Sea	inlet	-	Gate	DN50　DN50_Gate　1　un　€517　€517
V4001	-	Sea	inlet	-	Butterfly	DN300　DN300_Butterfly　1　un　€1,212　€1,212
V4003	-	Sea	Inlet	-	Butterfly	DN250　DN250_Butterfly　1　un　€868　€868
V4023	-	Overboard	-	Globe	DN32　DN32_Globe　1　un　€440　€440
V4024	-	Overboard	-	Globe	DN32　DN32_Globe　1　un　€440　€440
V4002	-	Sea	Inlet	-	Butterfly	DN300　DN300_Butterfly　1　un　€1,212　€1,212
V4004	-	Sea	Inlet	-	Butterfly	DN250　DN250_Butterfly　1　un　€868　€868
V4052	-	Sea	Inlet	-	Gate	DN50　DN50_Gate　1　un　€517　€517
V4026	-	Overboard	-	Globe	DN32　DN32_Globe　1　un　€440　€440
V4035	-	Exhaust	Overboard	-	Globe	DN150　DN150_Globe　1　un　€924　€924
V4025	-	Overboard	Cooling	Water	-	Globe	DN65　DN65_Globe　1　un　€546　€546
Access	-	estimated,	to	be	confirmed	upon	inspection　1　un　€2,175　€2,175
Transport　1　un　€1,299　€1,299
Launch	fees　1　un　€986　€986
Total　€14,539
Quote: 106 - Valve Pressure Testing Title: T&M Rates for Painting Valves Period: Initial Offer

Description　Qty　Un　Unit
Price　Total
Price

Single	Layer	of	White	Paint	(DN15	to	DN150)　un　€126
Single	Layer	of	White	Paint	(DN200	to	DN350)　un　€168
Single	Layer	of	White	Paint	(DN400	to	DN600)　un　€224
Full	Paint	System	(DN15	to	DN150)　un　€168
Full	Paint	System	(DN200	to	DN350)　un　€224
Full	Paint	System	(DN400	to	DN600)　un　€280
Total　€0.00
Section	subtotal　€14,539

Section 116 - E0109 - E0110 - E0112 - Shaft Survey
Ref: MYY-116220316-V3 Date: 16 March 2022
Client Specification

- Shafts
	- Inspection , check clearance on cutlass bearings
	- Inspection of seals and Water pump rebuild
	- Propellers Inspection , Straightened and rebalance if needed
MB92 Scope of Works

- Staging
- General visual inspection
- Removal of the rope guards (if existing)
- Take measurement of bearing tolerances where access is possible
- Install back the rope guards
- Supply report for Class
Notes

Assumes all parts are in good working order and does not include work on damaged or worn parts or threads
- Scope based on supply of correct technical information / drawings from vessel
- Scope to be clarified once Vessel is alongside
Exclusions

- Measurement of inboard shaft tube bearing
- Special Tools (owner supply)
- Access Removal other than rope guards covers if any
- Welding work
- Paint Repair (see section 600)
- OEM service engineer if requested by vessel.
- Shaft removal
- Shaft Seal Service
- Propeller removal and balancing
- Rebuild of Sea Water pump
- Class Fee
Quote: 116 - E0109 - E0110 - Shaft Survey Type: Budgetary Estimate Period: Initial Offer

Description　Qty　Un　Unit
Price　Total
Price

6t	Forklift　2　hr　€100.00　€200
16m	Cherry	Picker　1　dy　€164　€164
Bearing	Clearance	measurement　16　hr　€80.00　€1,280
Report	for	Class　4　hr　€85.00　€340
Total　€1,984

Type: Budgetary Estimate

Section 126 - E0111 - Rudder Survey

Ref: MYY-126220316-V3 Date: 16 March 2022
Client Specification

- Rudders
	- Inspect , check clearance , seals
MB92 Scope of Works

- Install scaffolding;
- Measure neck bearing clearances;
- Report for Class
Exclusions

- Remoaval of access plate if any to be carried our in T&M
- Dropping Rudders
- Purchase or replacement of any part
- Oil supply and change
- Paint repairs
- Any Class Fees
- Anything not included in this offer
- Anything not mentioned above
Quote: 126 - E0111 - Rudder Survey Type: Budgetary Estimate Period: Initial Offer

Description　Qty　Un　Unit
Price　Total
Price

Scaffold	Access　2　un　€943　€1,885
Take	Rudder	Clearances　8　hr　€80.00　€640
6t	Forklift　2　hr　€100.00　€200
Report	for	Class　2　hr　€85.00　€170
Total　€2,895

Section 150 - Grey & Black Water Tank Cleaning

Ref: MYY-150220316-V3 Date: 16 March 2022
MB92 Specification

- B&G Water tanks as per "E0110-Tanks and shaftline.pdf"
	- 1 : 6,05m3
	- 2 : 6,05m3
Scope of Works

- Removal and remounting of tank lid
- Cleaning of tank using high pressure washing
- Removal and destruction of cleaning residue
Notes

- Assumes tanks are in condition appropriate for age of vessel.
- Assumes free access to tank tops and does not include removal of any peripheral items or furniture.
- Local protection of runs for pipe work will be charged on a T&M basis
Exclusions

- Pumping of any liquids stored in tanks
- MARPOL destruction of existing liquid in tank, solids or cleaning residue
- Inspection of tank, photos or reports
- Any repairs to tanks including any damaged threads or fittings on access hatches
- Replacement of hatch gaskets where necessary
- Gaz Free Certificate
Quote: 150 - Grey & Black Water Tank Cleaning Type: Fixed Price
Period: Initial Offer

Description　Quantity　Un　Unit
Price　Total
Price

Opening	&	Closing	of	Hatch(es)　1　un　€130　€130
Cleaning	of	Tank　6.0　m³　€1,352　€1,352
Permit	for	Enclosed	Spaces　1　un　€140　€140
Additional	Pumping	of	Existing	Liquids	in	Tank　0　hr　€205
MARPOL	Certified	Destruction	of	Fluids　0　m³　€55.00
Total　€1,622
Quote: 150 - Grey & Black Water Tank Cleaning Type: Fixed Price

Period:	Initial	Offer

Description　Qty　Un　Unit
Price　Total
Price
Opening	&	Closing	of	Hatch(es)　1　un　€130　€130
Cleaning	of	Tank　6.0　m³　€1,352　€1,352
Permit	for	Enclosed	Spaces　1　un　€140　€140
Additional	Pumping	of	Existing	Liquids	in	Tank　0　hr　€205
MARPOL	Certified	Destruction	of	Fluids　0　m³　€55.00
Total　€1,622
Section	subtotal　€3,244

Type: Fixed Price
Section 166 - D0081 - Anchor Windlass
Ref: MYY-166220316-V3 Date: 16 March 2022
Client Specification

- Anchor Windlass and Winches
	- Inspection and service
MB92 Scope of works - Windlass

- Running Test and visual inspection
- Install deck protection
- Strip deck gear and stow on deck
- Measure brake band thickness
- Disconnect electric motor
- Take oil sample from gearbox
- Drain, flush and change oil
- Remove electric motor to workshop
- Motor service, bearings, cleaning ,varnish, brake adjustment
- Remount and connect motors
- Remount deck gear
- Test run
Notes

- Assumes adequate access for motor removal difficult access may incur additional cost
- Removal of planetary drive reduction box and service will be quoted separately, oil samples will give a good
- indication of gearbox condition. How ever may be required for deck seal replacement
- Work on seized or damaged components may incur additional cost
Exclusions

- OEM Service and OEM parts
- Relining of brakes
- Any replacement of parts except when mentioned
- Scaffold or steel structure to allow access
- Logistics such as cranes and forklifts
- MB92 assistance for handling

Quote:	166	-	D0081	-	Anchor	Windlass

Type:	Budgetary	Estimate
Period:	Initial	Offer

Description　Qty　Un　Unit
Price　Total
Price

Running	Test	and	visual	inspection　2　hr　€85.00　€170
Install	deck	protection　4　hr　€85.00　€340
Materials	for	protection　2　un　€218　€435
Strip	deck	gear	stow	on	deck　16　hr　€85.00　€1,360
Measure	brake	band	thickness　2　hr　€85.00　€170
Disconnect	electric	motor　8　hr　€85.00　€680
Take	oil	sample	from	gearbox　2　hr　€85.00　€170
Drain	,	flush	and	change	oil　4　hr　€85.00　€340
Oil	disposal　10　litres　€1.31　€13.05
Shell	Omala	S2	GX	220　10　litres　€4.75　€47.50
Remove	electric	motor	to	workshop　14　hr　€80.00　€1,120
Motor	service	,	bearings,	cleaning	,varnish,	brake	adjustment　54　hr　€80.00　€4,320
Remount	and	connect	motors　14　hr　€80.00　€1,120
Remount	deck	gear　14　hr　€80.00　€1,120
Shop	supplies　1　un　€218　€218
Test	run　1　hr　€85.00　€85.00
Total　€11,708

Type: Budgetary Estimate

Section 200 - Major Equipment

Type: Budgetary Estimate
Section 281 - E0120 - Thrusters

Ref: MYY-281220316-V3 Date: 16 March 2022
Client Specification

- Bow and Stern Thruster
	- Inspection , change gear oil and replace Zinc where needed
- Bow thruster model: ZF TT 1000 , L-Drive Unit
- Stern Thruster: ZF TT 1000, L-Drive Unit
- Scope of work: Zinc replacement and basic oil replacement and inspection
- No records of maintenance found
MB92 Scope of Works

- On both bow and stern thrusters:
	- Scafffolding
	- Control of the propellers and internal plays
	- Take oil samples for analysis
	- Drain oil from crankases
	- Opening of the bottom cover for visual inspection
	- Reinstall all the dismantled parts
	- Zinc anodes replacement including supply Tests & controls
	- Fill with new oil SHELL OMALA 100
Notes

- If some additional works have to be done, another estimate will be issued
- Parts if needed: Available in 3-4 weeks
Exclusions

- OEM Service and parts
- Service of the hydraulic motor
- Access to the thruster, tunnel, and protection around the working areas.
- Dismantling of the grills - see section 695
- Any paint work needed in the tunnel.
- Propspeed works - see section 696
- Cleaning of the tunnel.
- Treatment of wasted oil.
- Cleaning / Polishing of the propellers
- Any Class Fees
- Any parts or works other than listed
- Cranage & Logistic assistance will be charged on pro-rata basis
Quote: 281 - E0120 - Thrusters Type: Budgetary Estimate Period: Initial Offer

Description　Qty　Un　Unit
Price　Total
Price

Scaffolding　4　un　€870　€3,480
O'ring	set　2　un　€14.05　€28.10
Bolt	set　2　un　€20.09　€40.18
Anode　4　un　€134　€537
Hexagon	head	screw　8　un　€5.08　€40.60
Oil	analysis　2　un　€150　€300
Liters	of	Shell	OMALA	100	(estimated)　40　litres　€5.71　€229
Rags,	absorbers,	cleaning	product,…　1　un　€37.91　€37.91
Packing	and	transport	for	parts　1　un　€163　€163
Labour	for	work	described	above	-	estimated　1　un　€1,920　€1,920
Travelling	expenses	and	fees　2　un　€97.50　€195
Total　€6,970

Section 300 - Systems
Section 327 - I0082 - Duct and Vent Cleaning

Ref: MYY-327220316-V3 Date: 16 March 2022

Type: Fixed Price
Client Specification

- Professional Duct and vent cleaning
- The vents are blocked and spitting out black deposits , hair and etc even though the air handlers has been cleaned once a week.
MB92 Scope of Works

- Galley exhaust network cleaning and degreasing
	- Galley located on Main deck
	- Exhaust fan located into galley hood
	- Access :
		- from Galley hood
		- from exit grid on Sun deck
	- Cleaning includes hood filters, galley hood plenum, exhaust duct, firedamper and exhaust fan turbine
- Laundry exhaust network cleaning and dedusting
	- Laundry located on Lower deck
	- 2 dryers
	- Access :
		- from behind dryers
		- from exhaust fans
	- Cleaning includes dryers filters, 2 exhaust ducts and 2 exhaust fans turbines
- Air Conditioning Units cleaning and disinfection
	- 3 AC Units inventoried and connected with ducts on:
	- Bridge deck :
		- FA 1 serving Galley, Main saloon and Dining and 4 Guest cabins
	- Lower deck :
		- FA 2 serving 5 Crew cabins, Crew mess, Laundry and Bridge deck
		- AC 2 serving Owner stateroom
	- Cleaning includes connected ducts as far as possible
- Fan coils cleaning and disinfection : 21 fan coils inventoried and connected with ducts :
	- Sun deck : 2
	- Bridge deck : 1
	- Main deck : 8
		- Main saloon : 4
		- Galley : 2
		- Storage : 1
		- Study : 1
	- Lower deck : 10
		- Crew mess : 1
		- 3 Crew cabins : 3
		- Captain cabin : 1
		- Laundry : 1
		- 2 Twin Guest cabins : 2 2 Double Guest cabins : 2
	- Cleaning includes filters, evaporators, turbines and connected ducts.
- Ventilation exhaust network cleaning and disinfection
	- 23 air vents inventoried and connected with exhaust ducts :
		- Main deck : 3
			- Owner stateroom : 3
		- Lower deck : 20
			- 3 Crew cabins : 6
			- Captain cabin : 2
			- Dayhead : 1
			- Laundry : 1
			- 2 Twin Guest cabins : 4 2 Double Guest cabins : 6
		-
	- 3 Exhaust units not located for Crew, Guest and Owner areas
	- Cleaning includes exhaust units turbines and connected ducts.
Note

Masking of areas are include in sucbontractor scope but not overall protection
Exclusions

- Specific protection for this job
- The supply and replacement of defective parts found during disassembly
- Dismounting & remounting of deck heads, fairing, dampers in T&M
- Dismounting & remounting of access hatches in engine room and saloon in T&M
- Logistics, staging, cranes, etc...
- Metal works
- Repair works
Quote: 327 - I0082 - Duct and Vent Cleaning Type: Fixed Price Period: Initial Offer

Description　Qty　Un　Unit
Price　Total
Price

Galley	exhaust	network	cleaning	and	degreasing　1　un　€2,882　€2,882
Laundry	exhaust	network	cleaning	and	dedusting　1　un　€1,607　€1,607
Fresh	Air	Units	cleaning	and	disinfection　1　un　€4,077　€4,077
Fan	coils	cleaning	and	disinfection　1　un　€5,534　€5,534
Ventilation	exhaust	network	cleaning	and	disinfection　1　un　€3,934　€3,934
Total　€18,032
Section 341 - E0117 - OWS
Ref: MYY-341220316-V3 Date: 16 March 2022
Client Specification

Oily Water Separator 1000h service and certification Brand: Brannstrom Sweden AB. Model:BM488
MB92 Scope of Works

- Visual and functional inspection
- Disassemble unit
- Service pumps
- Replace prefilter
- Remove sensor unit, calibrate Sensor and re-install. Provide Certificate
- Check electrovalve
- Remount unit
- OPTION : Remove & replace particle filter
Notes

Pressure reducer installation to be quoted upon visual & functional inspection
Inclusions

- Certificate for Sensor Calibration
- Transport of spare parts
Exclusions

- Repair or replace unpredicted defective parts
- Replacement of electrovalve
- Any paint works, metal works
- Protection
Quote: 341 - E0117 - OWS Period: Initial Offer

Description　Qty　Un　Unit
Price　Total
Price

Disassemble	unit,	service	pumps	and	replace	prefilter　1　un　€1,485　€1,485
Calibrate	Sensor.	Certificate　1　un　€1,050　€1,050
Pump	service	kit　1　kit　€900　€900
Pre	filter	kit　1　un　€120　€120
Shipping	fees	of	spare	kits　1　un　€300　€300
Option	:	Particle	Filter	kit　1　un　€1,800　◊	€1,800
Total　€3,855

Section 400 - Deck
Section 401 - D0056 - Carbon Fiber Swim Ladder Repair

Ref: MYY-401220316-V3 Date: 16 March 2022

Type: Budgetary Estimate
Client Specification

- Carbon fiber swim ladder is broken severely
- The entire system have to be improved as at the moment the ladder is pivoting too much , doesn't have enough support to the hull and it is floating away from the hull instead of staying close to it
MB92 Scope of Works

- Remove damaged pins
- Repair damaged carbon IWO of pins
- Glue in new pins
- Swinging arm junction metal part removal
- Cleaning up and repairing swingning arm junction
- Gluing of new metal swinging arm pieces
- Dry fit onboard vessel Adjustment of top step and making of landing pad on ladder to suit rub rail form for a nice snug fit and suppor the ladder
Notes

Carbon finish on passerelle will need topcoat varnishing after works
Exclusions

- Any other parts or service works than listed
- Cranage & Logistic assistance will be charged on pro-rata basis
- Painting or top coat varnishing of any parts
- Any parts replacement if found worn, other than listed
- Protection
Quote: 401 - D0056 - Carbon Fiber Swim Ladder Repair Type: Budgetary Estimate Period: Initial Offer Description Qty Un Unit

Description　Qty　Un　Unit
Price　Total
Price

Labour	-	Estimated　1　un　€5,550　€5,550
Material	-	Estimated　1　un　€5,155　€5,155
Total　€10,705
Total

Name Carbon Fiber ladder 2.JPG Name Carbon fiber ladder 3.JPG Name Carbon fiber ladder 4.JPG

MY Lady May Quotation Case 22-50073 Doc 203-3 Filed 04/11/22 Entered 04/11/22 12:34:01 Page 30 of
Name Carbon fiber ladder.jpeg
Section 402 - D0067 - Anchor Pocket Stainless Fashion Plate
Ref: MYY-402220316-V3 Date: 16 March 2022
Client Specification

Anchor pocket stainless plate on hull, needs deep sanding and polishing. Damage caused from picking/dropping Anchor
MB92 Specification

- Surfaces grinding/rectification with finishing sanding
- Cleaning of the sanded areas by using a passivation acid
- Cleaning and rinsing of the acid
- Polishing of the anchor pockets mirror polishing finishing
Notes

- This quote is a budgetary estimate and will be confirmed upon inspection
- Works to be carried out from a cherry picker
- 5 days of work for both anchor pockets
- Polish finishing quality to be discussed and agreed by both parties
Exclusion

- Treatment of deep scratches
- Material recharging by means of welding
- Polishing of the anchor trunk
- Paint works touch-up
- Anything not included in this offer
- Anything not mentioned above
Quote: 402 - D0067 - Anchor Pocket Stainless Fashion Plate Period: Initial Offer

Description　Qty　Un　Unit
Price　Total
Price

Anchor	Pocket	sanding	and	polishing　1　un　€8,840　€8,840
16m	Cherry	Picker　5　dy　€164　€820
Total　€9,660

Section 421 - D0063 - MD and Upper Deck Teak Sanding and Caulking
Ref: MYY-421220316-V3 Date: 16 March 2022
Client Specification

- Teak on Main deck needs to be sanded and re-caulked in places
- On numerous places the caulking is higher than the teak and teak grains are as deep as 5mm
- Roughly 120 Sq. m of surface is to be sanded
MB92 Scope of Works

- Light sanding with 40 - 60 - 80 Grit
- Detailing
Notes

- Cauking product to be confirmed
- Inspection needs to done to send a proper quotation
- The repairs or removal of margin planks will be charged on a time and material base or quoted case by case or quoted on arrival measurement will be revised on board and final invoice will be pro-rata
Exclusions

- Protection
- Scaffolding & Tenting
- Local tent in Time and Materials
- Heating
- General logistics
- Removal of hardware / deck fittings in T&M
- Caulking repair
Quote: 421 - D0063 - MD and Upper Deck Teak Sanding and Caulking Period: Initial Offer Description Qty Un Unit

Price　Price

Sanding	and	recaulking　120　m²　€60.75　€7,290
Caulking	(price	per	linear	meter)　m　€35.00
Total　€7,290

Total
Section 601 - P0022 - Paint works
Ref: MYY-601220316-V3 Date: 16 March 2022

Client Specification

- Paint repairs around the vessel
	- Various areas around the boat are to be repaired, painted and/or polished
- This includes:
	- Guest areas- Main deck , passages PS and SB side and stairs to upper deck.
	- Swimming platform - numerous blistering and scratches
	- Gangway-scratches and chips
	- Fly deck window system - poles
MB92Scope of Works

- Protection of all non painted areas
- Corrosion opening using cisel and grinding machine P24/36
- Application of Hullgard epoxy primer
- Apply as necessary Awlfair trowable compound to match surrounding areas
- Fine filler Awlgrip surfacing filler can be applied to fill sanding scratches and porosity of Awlfair FW
- Seal out any new applied fairing with Highbuild Epoxy Primer
- Application of 3 coats of 545 Epoxy primer
- Application of 3 coats wet on wet of Awlgrip Gline - colour to be confirmed
Notes

- This is a budgetray estimate based on pictures (please refer to document in Appendix)
- To be confirmed upon inspection after yacht arrival
- Work to be carried out outside. Climatic conditions cannot be guaranteed, however the products will be applied in the best condition possible
- No guarantee is applicable on local repairs
- Only local spot repairs with hard cut line
Exclusions

- Composite repairs if required
- Tent , Extraction and filtration
- Caulking
- Removal of hardware
- Extra works due to silicon polishing or other polishing compounds
- Custom paint colours
- Sign writing, application of names etc ( or Removal )
- Cranes, Windlass, etc (unless otherwise mentioned above)
- Removal or painting of deck heads (unless otherwise mentioned above)
- Interior locker/door faces (unless otherwise mentioned ). When dismantled, to be paint up to watertight seal. If not exterior faces only
- Lights / light fittings
- Lifesaving equipment
- Accommodation / boarding ladders (unless otherwise mentioned)
- Jacuzzi / pool interiors
- Removable furniture
- Varnish work
- More than one protection of top coated surfaces
- All other works not directly involving a high gloss super yacht quality finish
- Any fairing/ shape improvements
- Rub rail of the swim platform to be re used
Quote: 601 - P0022 - Paint works Type: Budgetary Estimate Period: Initial Offer

Description　Qty　Un　Unit
Price　Total
Price

Paint	works	-	Budgetary	estimate　1　un　€26,000　€26,000
Total　€26,000

Type: Budgetary Estimate
Section 691 - Pressure Washing

Ref: MYY-691220316-V3 Date: 16 March 2022
MB92 Specification

Estimated hull surface: 425m2
Notes

MB92 La Ciotat will not be held responsible for any damage caused to existing paint systems during this operation Quote assumes that the vessel antifouling system is still functioning correctly and that the underwater area is not covered by growth other than slime and has no patina residue that cannot be removed using the standard pressure washing procedure outlined above

- Scrapping works below waterline, these are to be conducted on a time and materials basis
- Crossover pipes and tanks – quotation after inspection

Quote:	691	-	Pressure	Washing
Period:	Initial	Offer
Description　Qty　Un　Unit
Price　Total
Price

Pressure	Washing　425　m²　€3.86　€1,641
Cherry	Picker	Rental	Based	on	2	Used　1　dy　€328　€328
Total　€1,969

Section 692 - P0038 - Antifoul

Ref: MYY-692220316-V3 Date: 16 March 2022
MB92 Specification

- Estimated hull surface: 425m2
- Antifouling: Trilux 33 - 24 months Specification
Scope of Works

- Protection using appropriate tape for area not to be painted (e.g. boot top line, stainless bow plate, anodes , sensor, plimsole marks, etc.)
- Application: Roller
Notes

- Assumes that existing antifouling is in reasonable condition
- Antifouling of vessels on the yacht lift or dry docks will not cover areas under the chocks
- Vessels antifouled on the travel lift will have the chock areas antifouled after the lifting from the chocks and before the launch. No priming or other works can be completed; the areas antifouled in the way of the chocks will only be covered by warranty if the launch time falls out of the manufacturers recommended time
- The cherry picker pricing is for antifouling works only
- A spray application is only possible in tented conditions
- The antifouling calculation is based on the number of coats applied. For thickness based calculations please inquire. \*denotes low volume solids antifouls which could result in additional coats required to achieve manufactures recommended DFTs
Inclusions

Additional coat around waterline

- Antifouling of propellers & shafts
- Any local repair - to be quoted separately after pressure washing is complete
- The antifouling of jet drives or intakes which will be billed on a time and materials basis or quoted separately
- Crossover pipes and tanks – quotation after inspection
- Hull pipe fittings – antifouling stops 50mm inside pipes from hull surface

Quote:	692	-	P0038	-	Antifoul
Title:	International	-	Trilux	33
Period:	Initial	Offer

Description　Qty　Un　Unit
Price　Total
Price
Application	of	3	Coats	of	Antifoul　1381.25　m²　€5.60　€7,735
Price	based	on	using	Roller	application
Cherry	Picker	Rental	Based	on	1	Used　5.0　dy　€164　€820
Supply	of	Antifoul	-	International	-	Trilux	33　200　litres　€42.86　€8,573
Total　€17,128
Section 695 - E0114 - Grills & Sea Chest
Ref: MYY-695220316-V3 Date: 16 March 2022
Client Specification

Seachest : Inspection , clean all valves , clean strainer basket and repair if needed
MB92 Specification

Remove and replace grills below WL.

- Fixing of damaged threads or replacement of fastenings
- Any materials, works other than stated, or any resulting works

Quote:	695	-	Grills	&	Sea	Chest
Period:	Initial	Offer

Description　Diameter　Qty　Un　Unit
Price　Total
Price
Thrusters	grills　0,6m²	<	A
<	1m²　4　un　€263　€1,052
Sea	chests　A	>	1m²　2　un　€315　€630
1.5t	Forklift　hr　€75.00
16m	Cherry	Picker　dy　€164
Total　€1,682

Section 696 - P0037 - P0036 - P0035 - Propspeed Works
Ref: MYY-696220316-V3 Date: 16 March 2022
Client Specification

- Propellers Apply 2 coats of Propspeed
- Rudders Apply 2 coats of Propspeed
- Shafts Apply 2 coats of Propspeed
MB92 Specification

Propspeed works for propellors, rudders and shafts
Scope of Works

- 1. Preparation of propellers, bow, and stern thrusters
- 2. Application of Propspeed to propellers, bow, and stern thrusters
Notes

- Yard can't be held responsible in case of noise or vibrations if no sea trials were conducted with yard attendance prior haul out
- Painting of the propeller blade Leading and Trailing edge is not recommended and if done is the responsibility of the client
Exclusions

- Removal of any props
- Any materials, works other than stated, or any resulting works

Quote:	696	-	P0037	-	P0036	-	P0035	-	Propspeed	Works
Title:	Bow	&	Stern	Thruster	Propellors
Period:	Initial	Offer

Description　Qty　Un　Unit
Price　Total
Price
Labour	for	Preparation	&	Application　48　hr　€65.00　€3,120
Supply	Kits	of	Prop	Speed　6　un　€493　€2,958
16m	Cherry	Picker　2　dy　€164　€328
Total　€6,406

Total	◊	Optional	items	€1,800	not	included	in	total.　€192,249

Grand	Total　€192,249
Signature & Acceptance
Ref: MYY-220316-V3 Date: 16 March 2022

Signature	-	Owner's	Representative　Signature	-	Yard	Representative

MOMCHIL IVANOV
16TH MAR 2022
Date　Date
Notes

Notes i. All works subject to MB92 La Ciotat's Standard Terms & Conditions or ICOMIA Yacht Repair Contract

ii. All prices are without VAT

iii. Quote valid for 30 days from issue
Summary

Lady	May	-	O79	-	Spring	2022

006	-	Customs　€320
009	-	Insurance	Contribution
%	To	Be	Billed	on	Final	Invoice　€0.00
011	-	Alongside	Dockage
Dockage	&	Line	Handling　€10,100
013	-	Electricity	Connect	&	Supply　€462
014	-	Fresh	Water	Connect	&	Supply　€150
015	-	Rubbish	&	Waste	Disposal　€627
016	-	Environmental	Monitoring　€2,285
031	-	Container	&	Office	Rental　€0.00
033	-	Internet	Connection
Optional　€646
048	-	Standard	Labour
MB92	La	Ciotat	Internal	Labour	Rates　€0.00
048	-	Standard	Labour
%	of	Project	Management	to	be	Billed	on	Final	Invoice　€0.00
049	-	Forklift	&	Crane	Crew	Items
MB92	La	Ciotat	Equipment	Rates　€0.00
052	-	Shipyard	Access	-	Owner's	Contractors
Administration	Fee	per	Badge	-	T&M	Rates　€0.00
052	-	Shipyard	Access	-	Owner's	Contractors
Daily	Contribution	Fee	-	T&M	Rates　€0.00
061	-	Haul	Out	&	Launch　€16,710
062	-	Daily	Hardstanding　€7,735
063	-	Access	Tower　€869
064	-	Fire	Main　€473
065	-	Grey	&	Black	Water	Disposal　€690
066	-	Seawater	Cooling　€1,105
071	-	Protection　€6,010
106	-	Valve	Pressure	Testing　€14,539
106	-	Valve	Pressure	Testing
T&M	Rates	for	Painting	Valves　€0.00
116	-	E0109	-	E0110	-	Shaft	Survey　€1,984
126	-	E0111	-	Rudder	Survey　€2,895
150	-	Grey	&	Black	Water	Tank	Cleaning　€1,622
150	-	Grey	&	Black	Water	Tank	Cleaning　€1,622
166	-	D0081	-	Anchor	Windlass　€11,708

Case 22-50073　Doc 203-3　Filed 04/11/22　MY Lady May Quotation
Entered 04/11/22 12:34:01

281	-	E0120	-	Thrusters　€6,970
327	-	I0082	-	Duct	and	Vent	Cleaning　€18,032
341	-	E0117	-	OWS　€3,855
401	-	D0056	-	Carbon	Fiber	Swim	Ladder	Repair　€10,705
402	-	D0067	-	Anchor	Pocket	Stainless	Fashion	Plate　€9,660
421	-	D0063	-	MD	and	Upper	Deck	Teak	Sanding	and	Caulking　€7,290
601	-	P0022	-	Paint	works　€26,000
691	-	Pressure	Washing　€1,969
692	-	P0038	-	Antifoul
International	-	Trilux	33　€17,128
695	-	Grills	&	Sea	Chest　€1,682
696	-	P0037	-	P0036	-	P0035	-	Propspeed	Works
Bow	&	Stern	Thruster	Propellors　€6,406
Total	◊	Optional	items	€1,800	not	included	in	total.　€192,249
Grand	Total　€192,249
EXHIBIT 2

Quantum Contact: B. STAUFFER Direct Phone: +1 (954) 587-8971 EMAIL: bstauffer@quantumhydraulic.com

ESTIMATE Page 1/2 Date 09-Dec-2021 Quote QS-16008 Builder Hull No FDV 688 Vessel Name LADY MAY Contract No QS-16008 REV.1
Quantum Marine Stabilizers

3685 SW 30th. Avenue Ft. Lauderdale FL 33312

**Note: Quantum is proud of its reputation for quality and service. To ensure this position, Quantum's policy is to develop and maintain its own team of highly trained service technicians. Quantum does NOT have service agreements with or endorse third party service providers.**

Bill To: M/Y LADY MAY (FEADSHIP 688) Ship To: M/Y LADY MAY (FEADSHIP 688) HK INTERNATIONAL FUNDS INVESTMENTS (USA) PESTO SEA GROUP SRL C/O YACHTZOO LLC, C/O CATARINEAU & GIVENS CALATA MOLO VECCHIO MOD.3 MIAMI FLORIDA 8000 SW GENOVA 16128 UNITED STATES ITALY

Purchase Order No.　Customer ID
Salesperson ID
Shipping Method　Payment Terms　VAT/Reseller Number

QS-LADY MAY
B. STAUFFER　Prepayment
Quantity　Item Number　Description　UOM　Unit Price　Ext. Price
2 QMFIL28003　FILTER ELEMENT PRESSURE PARKER WPF3 05 MICRON
ECOGLASS III (INCLUDES O　EA　€138.27　€276.54
1 QMFIL14002　FILTER ELEMENT RETURN SCHROEDER K (10MICRON-SYNTH)
(FITS RT)　EA　€75.30　€75.30
2 QMCAR13117　CARTRIDGE CHECK VALVE NOSE TO SIDE 80GPM 5000PSI T-16A
CRACK @ 15PSI　EA　€175.76　€351.52
2 QMCAR13340　CARTRIDGE DIRECTIONAL 2WAY 2POS SOLENOID NC 4GPM
(2PORT UNLOADER) <alt< td="">EA€192.93€385.86</alt<>　EA　€192.93　€385.86
2 QMCOI80016　COIL 28VDC SUN W/ DIN43650 PINS FORM A FLEX　EA　€50.25　€100.50
2 QMSUP23105-0D　SUPPRESSOR W&M HYD NOISE 3000PSI 24GPM SAE16 W/
POPPET & CORE VALVE AN　EA　€748.14　€1,496.28
2 QMACC55007　KIT ACCUMULATOR BLADDER 5.0 GALLON HYDAC BLADDER　EA　€869.66　€1,739.32
NOTE:　IN CASE PRE-CHARGE IS FOUND OK, BLADDERS CAN BE KEPT AS
SPARE FOR FUTURE SERVICE
1 QMCOO20060　TUBE STACK FOR BOWMAN HYDRAULIC COOLER FOR FC140-
****-4　EA　€866.87　€866.87
2 QMCOO20071　ORING SEAL FOR BOWMAN HYDRAULIC COOLER FOR FC STYLE
(ONE ORING)　EA　€7.70　€15.40
1 QMFEL00850　FITTING ELBOW 90 SAEM 16 X NPTM 16 POSITIONABLE STEEL　EA　€28.25　€28.25
VALVE CHECK SWING HIGH FLOW 1" NPT FEMALE CLASS 125
1 QMVAL12278
BRONZE (FRESH WATE　EA　€73.07　€73.07

Case 22-50073 Doc 203-3 Filed 04/11/22 Entered 04/11/22 12:34:01 Page 42 of 50

Quantum Contact:　B. STAUFFER

Direct Phone: +1 (954) 587-8971 EMAIL:
bstauffer@quantumhydraulic.com

ESTIMATE Page 2/2 Date 09-Dec-2021 Quote QS-16008 Builder Hull No FDV 688 Vessel Name LADY MAY Contract No QS-16008 REV.1

Purchase Order No.　Customer ID　Salesperson ID　Shipping Method
Payment Terms　VAT/Reseller Number

QS-LADY MAY　B. STAUFFER　Prepayment
Quantity　Item Number　Description　UOM　Unit Price　Ext. Price
NOTE:　2 PRESSURE GAUGES MOVING FORWARD, LOCAL NEW HOSES
TO BE MANUFACTURED VIA SHIPYARD
CYLINDER MAIN 95/60/277MM (QC1800 HD) 45MM & 57MM
4 QCCYL00093-AD00
BEARING ID - V00 REV　EA　€6,476.61　€25,906.44
4 QCPIN22100-BA02　KIT PIN CYLINDER TAPER 50MM NOMINAL 2012-DESIGN (57MM
BEARING ID) FULL　EA　€2,126.50　€8,506.00
4 QCPIN18101-AA02　KIT PIN CYLINDER TAPER 40MM NOMINAL 2012-DESIGN (45MM
BEARING ID) FULL　EA　€2,029.59　€8,118.36
2 AHS0000104-CA00　HOSE KIT FOR HULL UNIT 1800 COMPLETE V00 REV C　EA　€1,062.73　€2,125.46
4.00 LABOR　10 HOURS A DAY　QM LABOR FOR 2 TECHNICIANS 2 DAYS ON SITE EA, BASED ON　EA　€1,600.00　€6,400.00
4.00 TRAVEL　TRAVEL TIME FOR 2 TECHNICIANS, BASED ON 10 HOURS A DAY　EA　€900.00　€3,600.00
6 SUBSISTENCE　HOTELS, FOOD, DRINKS AND SMALL TAXIS FARES　EA　€275.00　€1,650.00
2 TRAVEL EXPENSES　TRAVEL EXPENSES ESTIMATED　EA　€1,000.00　€2,000.00
1 FREIGHT　ESTIMATED FREIGHT CHARGES NL>IT　EA　€750.00　€750.00
1 FREIGHT　ESTIMATED FREIGHT CHARGES USA>IT　EA　€750.00　€750.00

Subject to Quantum's Terms and Conditions at Misc €0.00 www.quantumhydraulic.com Tax €0.00

€65,215.17

€0.00
€0.00
€65,215.17

EXHIBIT 3

Case 22-50073 Doc 203-3 Filed 04/11/22 Entered 04/11/22 12:34:01 Page 44 of 50
Sea Inlet valves replacement

MB92 La Ciotat

Date

/ Summary

- A. Valves positions and conditions
- B. Expected "best case" planning
A/ Valves positions and conditions

View of filters tops – Need to access under, on hull bottom, to remove the bolts.
A/ Valves positions and conditions

Space around the filters. Access very difficult. Some cut-out may be needed.
A/ Valves positions and conditions

Bolts are completely rusty. Unbolting will be very difficult and may need bolts to be cut, causing damages on the surroundings elements.

No guaranty that the hull flanges and filter are not corroded and need replacement.
B/ Expected "best case" planning

Considering bolts and valves conditions, 3 weeks minimum to complete the work assuming no cutting and no welding will be necessary. Worst case scenario 6 weeks +.

No guaranty on the launch date. It will highly depends on what we will find after removal.

During this work, no other works can be done in the engine room. Case 22-50073 Doc 203-3 Filed 04/11/22 Entered 04/11/22 12:34:01 Page 50 of 50
Thank you

MB92 La Ciotat

Date